Skip to main content
CityRuleLookup
☀️ Solar Energy/Panel Permits

Panel Permits: Antioch vs Oakley

How do panel permits rules compare between Antioch, CA and Oakley, CA?

Antioch has fewer restrictions than Oakley.

Antioch, CA

Contra Costa County

Few Restrictions

Antioch issues residential rooftop solar permits under the California Solar Rights Act (Civil Code 714) and AB 2188 streamlined-permit mandate. Standard systems are processed within 3 business days, often same-day via the SolarAPP+ automated plan review.

View full Antioch rules →

Oakley, CA

Contra Costa County

Some Restrictions

Solar PV installations in Oakley must comply with the 2022 California Electrical Code (Article 690), California Residential Code, California Fire Code Chapter 11B access pathways, and California Title 24 Part 6 energy standards. Systems must maintain rooftop access and ventilation pathways for firefighter operations.

View full Oakley rules →

Key Facts Comparison

FactAntiochOakley
--
Fact-CEC Article 690 rapid-shutdown required

Highlighted rows indicate differences between cities.

Antioch FAQ

Oakley FAQ

What is rapid shutdown?

CEC 690.12 requires module-level rapid shutdown so firefighters can de-energize rooftop PV within 30 seconds of activating a shutdown switch.

Can I mount panels on every part of my roof?

No. Fire Code §1205 requires 18-inch clearances at ridges and 36-inch clearances at hips on single-family roofs to provide firefighter access.

How big can my home battery be?

Residential battery systems are limited to 20 kWh per unit with aggregate limits per location under CFC §1207. Larger installations require enhanced review.

Compare other topics

See how Antioch and Oakley compare on other ordinance categories.

Want to add a third city?

Use our full comparison tool to compare up to three cities.

Open Comparison Tool