Skip to main content
CityRuleLookup
☀️ Solar Energy/Panel Permits

Panel Permits: El Monte vs Lancaster

How do panel permits rules compare between El Monte, CA and Lancaster, CA?

El Monte has fewer restrictions than Lancaster.

El Monte, CA

Los Angeles County

Few Restrictions

El Monte provides streamlined solar permitting per AB 2188 and the Solar Rights Act. Small residential rooftop systems qualify for expedited review. Ground-mounted arrays exempt from setbacks per CA Residential Code.

View full El Monte rules →

Lancaster, CA

Los Angeles County

Heavy Restrictions

Lancaster was the first U.S. city to require solar on new homes. Its Zero Net Energy Home Ordinance (effective Jan 1, 2018) mandates a solar system equivalent to 2 watts per square foot for new residential construction.

View full Lancaster rules →

Key Facts Comparison

FactEl MonteLancaster
StreamlinedYes, per AB 2188-
Ground MountExempt from setbacks-
New ConstructionSolar required per Energy Code-
Office HoursMon-Thu 8 AM - 4 PM-
Effective-January 1, 2018
Requirement-2 watts per sq ft
Compliance Paths-Solar / fee / combo
First in US-Yes (2017 adoption)

Highlighted rows indicate differences between cities.

El Monte FAQ

Do I need a permit for solar panels?

Yes, a building and electrical permit is required. Many jurisdictions offer expedited or over-the-counter permits for standard residential rooftop solar systems.

Can my neighbor build something that shades my solar panels?

Many states have solar access laws that protect existing solar installations. Check state law and El Monte zoning code for solar easement protections.

Lancaster FAQ

Do new homes in Lancaster need solar panels?

Yes. The Zero Net Energy Home Ordinance (effective Jan 1, 2018) requires new single-family homes to have a solar system equivalent to 2 watts per square foot of conditioned floor area, or pay a mitigation fee in lieu.

Can I pay a fee instead of installing solar?

Yes. Builders can fully pay an in-lieu mitigation fee, or combine partial solar with a partial fee. The combined value must equal the 2 W/sq ft requirement; details set by the city's permit process.

Compare other topics

See how El Monte and Lancaster compare on other ordinance categories.

Want to add a third city?

Use our full comparison tool to compare up to three cities.

Open Comparison Tool