Panel Permits: Folsom vs Sacramento
How do panel permits rules compare between Folsom, CA and Sacramento, CA?
Folsom has fewer restrictions than Sacramento.
Folsom, CA
Sacramento County
Folsom issues rooftop residential solar permits over the counter in 1-3 business days under AB 2188/SB 379 streamlining. Fees are capped by state law. Title 24 requires solar on most new homes.
View full Folsom rules →Sacramento, CA
Sacramento County
Sacramento requires building permits for solar panel installations under City Code Title 15 and complies with the California Solar Permitting Guidebook (AB 2188) for streamlined residential solar permitting. Residential rooftop solar systems up to 10 kW qualify for an expedited over-the-counter permit process. The Sacramento Municipal Utility District (SMUD) provides net metering and interconnection services for solar customers.
View full Sacramento rules →Key Facts Comparison
| Fact | Folsom | Sacramento |
|---|---|---|
| Streamlining | AB 2188 / SB 379 | - |
| Automated path | SolarAPP+ available | - |
| Fee cap | $450 + $15/kW > 15 kW | - |
| New homes | Title 24 solar mandate | - |
| Processing | 1-3 business days | - |
| Code Section | - | Sacramento City Code Title 15, AB 2188 |
| Streamlined Permits | - | Residential systems up to 10 kW qualify |
| Processing Time | - | 1-3 business days for qualifying systems |
| Utility | - | SMUD provides net metering and interconnection |
| New Construction | - | Solar required on new homes (Title 24) |
Highlighted rows indicate differences between cities.
Folsom FAQ
How fast can I get a solar permit in Folsom?
Residential rooftop systems using the SolarAPP+ automated path can be permitted within hours. Standard applications are processed in 1-3 business days under SB 379 mandates.
Who enforces this in Folsom?
Folsom code enforcement at (916) 355-7285 handles most complaints.
Sacramento FAQ
How long does it take to get a solar permit in Sacramento?
Qualifying residential rooftop solar systems up to 10 kW can receive an expedited permit within 1-3 business days through Sacramento's streamlined process under AB 2188.
Do new homes in Sacramento need solar panels?
Yes. California's Title 24 Building Energy Efficiency Standards require solar panels on most new residential construction built since January 2020.
Compare other topics
See how Folsom and Sacramento compare on other ordinance categories.
Want to add a third city?
Use our full comparison tool to compare up to three cities.
Open Comparison Tool