Panel Permits: Fresno vs Selma
How do panel permits rules compare between Fresno, CA and Selma, CA?
Selma has fewer restrictions than Fresno.
Fresno, CA
Fresno County
Fresno requires building permits for solar panel installations per FMC Chapter 11 and the California Building Code. Under AB 2188 (California Solar Permitting Act), the City must offer a streamlined, expedited permitting process for small residential rooftop solar systems. Permits for standard residential systems (up to 10 kW) are processed ministerially without discretionary review. Inspections are required to verify electrical and structural compliance.
View full Fresno rules →Selma, CA
Fresno County
Selma uses SolarAPP+ for instant residential solar permits. Standard permits require site plan, building plans, and Title 24 docs. AB 2188 streamlined process applies.
View full Selma rules →Key Facts Comparison
| Fact | Fresno | Selma |
|---|---|---|
| Permit Required | Yes, building permit for all installations | - |
| Streamlined Process | AB 2188 expedited review for residential systems | - |
| Typical Processing | 1 business day for standard residential systems | - |
| State Law | CA Solar Permitting Act (Gov. Code §65850.5) | - |
| HOA Override | CA Solar Rights Act limits HOA restrictions | - |
| Permit System | - | SolarAPP+ (instant issuance) |
| Plan Revisions | - | 3 free revisions |
| Building Code | - | 2022 California Building Code |
| Contact | - | (559) 891-2208 |
Highlighted rows indicate differences between cities.
Fresno FAQ
How long does it take to get a solar permit in Fresno?
Standard residential rooftop solar permits are typically processed within one business day under California's streamlined permitting law (AB 2188). Larger or ground-mounted systems may take longer.
Do I need my HOA's approval to install solar panels?
California's Solar Rights Act (Civil Code §714) significantly limits HOA restrictions on solar installations. HOAs cannot prohibit solar panels and can only impose reasonable aesthetic requirements that do not increase cost by more than $1,000 or reduce efficiency by more than 10%.
Selma FAQ
How do I get a solar panel permit in Selma?
For qualifying residential systems, register at solarapp.nrel.gov, submit your application through SolarAPP+, then upload the approved documents to the Selma Permit Center. Once fees are paid, the permit is issued instantly. Projects not eligible for SolarAPP+ go through the standard plan check process.
How long does it take to get a solar permit in Selma?
Through SolarAPP+, qualifying residential solar permits are issued instantly once the application is completed and fees are paid. Standard solar permits go through the regular plan check process, which may take several business days.
Do I need an inspection after installing solar panels in Selma?
Yes. The Selma Building Department must conduct an inspection to verify structural attachment, electrical connections, and code compliance before the system can be connected to the utility grid.
Compare other topics
See how Fresno and Selma compare on other ordinance categories.
Want to add a third city?
Use our full comparison tool to compare up to three cities.
Open Comparison Tool