Skip to main content
CityRuleLookup
☀️ Solar Energy/Panel Permits

Panel Permits: Martinez vs Oakley

How do panel permits rules compare between Martinez, CA and Oakley, CA?

Martinez has fewer restrictions than Oakley.

Martinez, CA

Contra Costa County

Few Restrictions

Martinez follows California's streamlined solar permitting requirements under AB 2188 and SB 379, issuing over-the-counter or online permits for standard residential rooftop PV systems typically within one business day. Title 24 Part 6 requires solar on most new homes. California Civil Code Section 714 prohibits HOA and local restrictions that significantly reduce system performance.

View full Martinez rules →

Oakley, CA

Contra Costa County

Some Restrictions

Solar PV installations in Oakley must comply with the 2022 California Electrical Code (Article 690), California Residential Code, California Fire Code Chapter 11B access pathways, and California Title 24 Part 6 energy standards. Systems must maintain rooftop access and ventilation pathways for firefighter operations.

View full Oakley rules →

Key Facts Comparison

FactMartinezOakley
--
Fact-CEC Article 690 rapid-shutdown required

Highlighted rows indicate differences between cities.

Martinez FAQ

Oakley FAQ

What is rapid shutdown?

CEC 690.12 requires module-level rapid shutdown so firefighters can de-energize rooftop PV within 30 seconds of activating a shutdown switch.

Can I mount panels on every part of my roof?

No. Fire Code §1205 requires 18-inch clearances at ridges and 36-inch clearances at hips on single-family roofs to provide firefighter access.

How big can my home battery be?

Residential battery systems are limited to 20 kWh per unit with aggregate limits per location under CFC §1207. Larger installations require enhanced review.

Compare other topics

See how Martinez and Oakley compare on other ordinance categories.

Want to add a third city?

Use our full comparison tool to compare up to three cities.

Open Comparison Tool