El Monte's Environmental Rules: The Rules That Matter

By CityRuleLookup Editorial Team

Every city handles environmental rules a little differently. In El Monte, California, there are 3 distinct rules that residents and property owners should be aware of. Some are stricter than what neighboring cities enforce, and others are more relaxed. Here is what you need to know.

Stormwater Management

El Monte bans any nonstormwater discharge into the city storm drain system under Municipal Code Chapter 13.16, administered by the Community Development Director. Property and business owners must keep pollutants, litter and runoff out of gutters, catch basins and channels, and must comply with the citywide NPDES Permit No. CAS004001. Violations are prosecuted as misdemeanors or infractions.

Key details: Governing chapter: El Monte Municipal Code Chapter 13.16. Enforcing agency: Community Development Director. Spill hotline: 580-2058, Public Works and Engineering Division. Penalty: Misdemeanor or infraction per Gov. Code Sections 36900-36901. Nuisance lien: Unpaid abatement bill liened after 60 days.

Violating Chapter 13.16 is a misdemeanor unless the enforcement officer elects to charge it as an infraction; a misdemeanor carries the fine and jail limits set by Government Code Section 36901, an infraction the fine limits of Section 36900, and a third infraction for the same provision within twelve months can be charged as a misdemeanor (Section 13.16.130). Each day a violation continues is a separate offense (Section 13.16.140), and the city can abate a violation as a public nuisance and lien the property for the cost if unpaid within sixty days (Section 13.16.170).

Erosion Control

El Monte requires an erosion and sedimentation control permit alongside any grading permit under Municipal Code Section 15.40.070(B), backed by a security deposit set by the Public Works-Engineering Division. Erosion controls must go in within 60 days of finishing grading, and the City Engineer can issue a stop-work notice if measures aren't installed within 24 hours of a forecast storm.

Key details: Permit trigger: Required alongside grading permit per Β§15.40.050. Enforcing agency: City Engineer, Public Works-Engineering Division. Install deadline: Controls required within 60 days after grading ends. Security deposit: Set by Public Works-Engineering Division fee schedule. Storm deadline: 24-hour deadline to install controls before forecast storm.

Missing the 24-hour deadlines is what triggers enforcement: if approved erosion controls aren't in place within 24 hours of a predicted storm, or sediment that reaches the public right-of-way isn't cleaned up within 24 hours after the storm ends, the City Engineer can halt all work with a stop-work notice until the storm water pollution prevention plan is fully implemented, and the security deposit can be drawn on to cover the city's costs.

Coastal Development

El Monte is an inland San Gabriel Valley city approximately 25 miles from the Pacific Ocean and is NOT within the California Coastal Zone. The California Coastal Act (Public Resources Code Section 30000 et seq.) does not apply - no Coastal Development Permit is required for any project in El Monte.

Key details: Inside Coastal Zone?: No - El Monte is ~25 miles inland. Coastal Development Permit required?: No. Local Coastal Program (LCP)?: Not required (PRC Section 30500 does not apply). Coastal Commission jurisdiction?: None. Applicable water rules instead: EMMC Chapter 13.16 (Stormwater) + LA RWQCB MS4 Permit.

Not applicable - the California Coastal Act does not apply to El Monte. Construction activities in El Monte are regulated by the El Monte Municipal Code and California Building Code, not by the Coastal Commission.

The Bottom Line

El Monte's environmental rules rules are a mixed bag. Some areas are strict, others are relaxed, and the details matter. The best approach is to check the specific rule that applies to your situation rather than assuming El Monte is broadly strict or permissive.

Keep in mind that El Monte can amend these rules at any council meeting. For the most current version of any rule mentioned here, check the specific ordinance page, where we track updates as they happen.