Skip to main content
CityRuleLookup
☀️ Solar Energy/Panel Permits

Panel Permits: Arlington vs Somerville

How do panel permits rules compare between Arlington, MA and Somerville, MA?

Arlington and Somerville have similar restriction levels.

Arlington, MA

Middlesex County

Few Restrictions

Solar PV requires a building and electrical permit under 780 CMR and 527 CMR 12. The MA Solar Access Law, MGL c.40A s.3, protects installations from zoning bans.

View full Arlington rules →

Somerville, MA

Middlesex County

Few Restrictions

Solar installations in Somerville need ISD building and electrical permits. Most rooftop systems qualify for expedited review and are allowed by right.

View full Somerville rules →

Key Facts Comparison

FactArlingtonSomerville
Building code780 CMR-
Electrical code527 CMR 12-
Solar access lawMGL c.40A s.3-
IncentiveSMART program-
UtilitiesEversource, Nat Grid-
State protection-MGL c.40A s.3 solar access
Permits-Building and electrical from ISD
Expedited-Residential under 10 kW typical
Ground mount-Full zoning review
Historic-HPC approval, rear preferred

Highlighted rows indicate differences between cities.

Arlington FAQ

Can my town ban solar panels?

No. MGL c.40A s.3 prohibits unreasonable restrictions on solar energy systems.

Is net metering available?

Yes, through the MA DPU tariff subject to allocation caps.

Somerville FAQ

Does Somerville allow solar panels on historic district homes?

Yes, but HPC reviews panel placement. Approval is routine for rear-roof installations; street-facing arrays may be denied or require low-profile designs.

How long does a solar permit take?

ISD typically turns around expedited residential solar permits in about 2 weeks. Eversource interconnection can take 4 to 8 weeks separately.

Compare other topics

See how Arlington and Somerville compare on other ordinance categories.

Want to add a third city?

Use our full comparison tool to compare up to three cities.

Open Comparison Tool