Skip to main content
CityRuleLookup
☀️ Solar Energy/Panel Permits

Panel Permits: Arlington vs Waltham

How do panel permits rules compare between Arlington, MA and Waltham, MA?

Arlington and Waltham have similar restriction levels.

Arlington, MA

Middlesex County

Few Restrictions

Solar PV requires a building and electrical permit under 780 CMR and 527 CMR 12. The MA Solar Access Law, MGL c.40A s.3, protects installations from zoning bans.

View full Arlington rules →

Waltham, MA

Middlesex County

Few Restrictions

Waltham requires building and electrical permits for solar installations, with expedited review under Massachusetts SolarAPP+ adoption and favorable zoning under MGL c.40A s.3.

View full Waltham rules →

Key Facts Comparison

FactArlingtonWaltham
Building code780 CMR-
Electrical code527 CMR 12-
Solar access lawMGL c.40A s.3-
IncentiveSMART programMA SMART program
UtilitiesEversource, Nat Grid-
State Protection-MGL c.40A s.3
Permits Required-Building plus electrical
Utility-Eversource interconnect
Historic District-Extra review required

Highlighted rows indicate differences between cities.

Arlington FAQ

Can my town ban solar panels?

No. MGL c.40A s.3 prohibits unreasonable restrictions on solar energy systems.

Is net metering available?

Yes, through the MA DPU tariff subject to allocation caps.

Waltham FAQ

Can Waltham deny my solar permit?

Not for aesthetic reasons alone. MGL c.40A s.3 protects solar installations from unreasonable local restrictions. Safety and structural issues are legitimate grounds for revision.

How long does a Waltham solar permit take?

Standard residential rooftop permits typically take 10 to 15 business days. Ground-mounted or historic district projects take longer due to additional review.

Compare other topics

See how Arlington and Waltham compare on other ordinance categories.

Want to add a third city?

Use our full comparison tool to compare up to three cities.

Open Comparison Tool