Outdoor Kitchen Permits: Arlington vs Fort Worth
How do outdoor kitchen permits rules compare between Arlington, TX and Fort Worth, TX?
Arlington and Fort Worth have similar restriction levels.
Arlington, TX
Tarrant County
Built-in outdoor kitchens in Arlington require multiple permits through the Community Development and Planning Department: a building permit for the structure, a gas-line permit for natural gas or stationary propane, an electrical permit, and a plumbing permit if connected to water/sewer. Structures must comply with UDC Article 5 setbacks (typically 5 ft side, 10 ft rear in R districts). Atmos Energy connections require separate utility coordination.
View full Arlington rules →Fort Worth, TX
Tarrant County
Permanent outdoor kitchens in Fort Worth require building, plumbing, electrical, and/or gas permits under City Code Chapter 7 (Building Code) when they include utilities or covered structures. Freestanding portable BBQ islands without permanent hookups generally don't need a permit. Setback rules from Zoning Ord. Section 5.300 apply.
View full Fort Worth rules →Key Facts Comparison
| Fact | Arlington | Fort Worth |
|---|---|---|
| Permit Portal | Arlington OneStart | - |
| Trade Permits | Gas, electrical, plumbing as applicable | - |
| Setback Code | UDC Article 5 (5 ft side / 10 ft rear) | - |
| Propane > 10 gal | AFD IFC Ch. 61 review | - |
| Plan Review Time | 2–4 weeks typical | - |
| Code Section | - | City Code Ch. 7; Zoning Ord. Sec. 5.300 |
| Portable Grill | - | No permit needed |
| Gas Line | - | Fuel gas permit + licensed plumber |
| Electrical | - | Electrical permit required |
| Setback (Side) | - | 5 ft (most districts) |
Highlighted rows indicate differences between cities.
Arlington FAQ
Do I need a permit for an outdoor kitchen in Arlington?
Yes. A building permit is required through the OneStart portal plus separate gas, electrical, and plumbing permits as applicable. Self-contained portable grills (not built-in) don't need permits.
How long does an outdoor kitchen permit take in Arlington?
Standard OneStart plan check is 2–4 weeks. Entertainment District properties near AT&T Stadium add design review (1–2 months). Simple gas/electrical trade permits may issue in 1–2 weeks once the building permit is granted.
Fort Worth FAQ
Do I need a permit for a Fort Worth outdoor kitchen?
Yes if it includes gas, electrical, plumbing, or a roof structure over 200 sq ft. A simple portable BBQ island without utility hookups does not require a permit. Gas extensions always require a fuel gas permit under Fort Worth City Code Chapter 7 and IRC G2417.
How close can my Fort Worth outdoor kitchen be to the property line?
Typically at least 5 feet from side property lines and 10-15 feet from rear lines under Fort Worth Zoning Ordinance Section 5.300, varying by zoning district. Roofed outdoor kitchens over 200 sq ft must fit inside the lot's buildable area.
Can I run a gas line to my Fort Worth backyard BBQ?
Yes with a fuel gas permit under City Code Chapter 7. The line must be installed by a licensed plumber or LP-gas installer registered with the Texas Railroad Commission (16 TAC Ch. 9), pressure-tested per IRC G2417, and inspected before backfill.
Compare other topics
See how Arlington and Fort Worth compare on other ordinance categories.
Want to add a third city?
Use our full comparison tool to compare up to three cities.
Open Comparison Tool