Skip to main content
CityRuleLookup
☀️ Solar Energy/Panel Permits

Panel Permits: Atlanta vs Roswell

How do panel permits rules compare between Atlanta, GA and Roswell, GA?

Atlanta and Roswell have similar restriction levels.

Atlanta, GA

Fulton County

Some Restrictions

Atlanta requires building permits for solar panel installations under the city's building code, which adopts the International Building Code and International Residential Code. The Office of Buildings issues permits through the standard building permit process. Georgia's Solar Easements Act (O.C.G.A. §44-9-20) supports property owners' rights to access sunlight for solar energy systems.

View full Atlanta rules →

Roswell, GA

Fulton County

Some Restrictions

Residential solar PV installations in Roswell require a building permit and an electrical permit. Plans must include the structural attachment detail, electrical single-line diagram, and inverter placement. Roof-mounted systems on existing structures often qualify for expedited review.

View full Roswell rules →

Key Facts Comparison

FactAtlantaRoswell
Permits RequiredBuilding permit and electrical permit-
Issuing OfficeAtlanta Office of Buildings-
Net MeteringGeorgia Power — up to 25 kW residential-
Solar EasementsVoluntary under O.C.G.A. §44-9-20-
Code BasisInternational Building/Residential Code-
Required Permits-Building + electrical
Codes-2018 IRC, NEC, IFC
Fire Setback (roof)-3 ft from ridge, 18 in from edge (IFC §605.11)
Utility-Georgia Power net metering (capped)
Building Contact-Community Development

Highlighted rows indicate differences between cities.

Atlanta FAQ

Do I need a permit for solar panels in Atlanta?

Yes. Both a building permit and electrical permit are required for solar panel installations. Plans must be submitted to the Office of Buildings showing structural and electrical compliance before installation begins.

Does Georgia have net metering?

Georgia Power offers net metering for residential solar systems up to 25 kW. Excess energy is credited to your account. You must apply to Georgia Power for interconnection approval after your system passes city inspection.

Roswell FAQ

Do I need a permit to install solar panels in Roswell?

Yes, building and electrical permits are required. Most reputable installers pull the permits as part of the installation package.

Are there fire-code setbacks for rooftop solar?

Yes, the 2018 IFC §605.11 requires a 3-foot clear path from the ridge and 18 inches from roof edges for firefighter access, with some exceptions for steep-pitch and small-array conditions.

Compare other topics

See how Atlanta and Roswell compare on other ordinance categories.

Want to add a third city?

Use our full comparison tool to compare up to three cities.

Open Comparison Tool