Skip to main content
CityRuleLookup
πŸ—οΈ Accessory Structures/ADU Impact Fees

ADU Impact Fees: Bellevue vs Kent

How do adu impact fees rules compare between Bellevue, WA and Kent, WA?

Bellevue and Kent have similar restriction levels.

Bellevue, WA

King County

Few Restrictions

Bellevue exempts ADUs from transportation and school impact fees in practice, consistent with Washington HB 1337 (RCW 36.70A.696), which caps any ADU impact fee at 50 percent of the single-family rate. Only standard plan-review and building-permit fees apply, plus utility connection charges if a new water or sewer service is needed.

View full Bellevue rules β†’

Kent, WA

King County

Few Restrictions

Kent waives Park and Transportation Impact Fees for the first ADU on a single-family lot and reduces them by 50 percent for the second ADU under KCC 15.08.250, consistent with Washington's RCW 36.70A.696 cap. Applicants still pay building, plan-review, and trade permit fees, plus utility connection charges only if a new service line is required.

View full Kent rules β†’

Key Facts Comparison

FactBellevueKent
Transportation Impact FeeExempt for ADUs-
School Impact FeeExempt for ADUsKent SD rate applies
State Cap50% of SFR (RCW 36.70A.696)50% of SFR (RCW 36.70A.696)
Building PermitPer WA fee schedule-
Utility ConnectionOnly if new serviceOnly if new service
Park/Transportation 1st ADU-Waived
Park/Transportation 2nd ADU-50% of SFR
Electrical Permit-WA L&I (not city)

Highlighted rows indicate differences between cities.

Bellevue FAQ

Does Bellevue charge impact fees for ADUs?

No. Bellevue's current practice exempts ADUs from both transportation and school impact fees. Washington RCW 36.70A.696 also caps any ADU impact fee at 50 percent of the single-family rate, so even if the policy changes, fees cannot exceed half of the standard SFR rate.

What fees do I still pay for a Bellevue ADU?

Standard building, plan-review, and trade permit fees scaled to construction valuation. Utility connection fees from Bellevue Utilities only apply if you add a new water or sewer service line. Stormwater fees apply if new impervious surface exceeds the BCC threshold.

Kent FAQ

Does Kent charge impact fees on ADUs?

Park and Transportation Impact Fees are waived for the first ADU on a Kent lot and reduced to 50 percent of the single-family rate for the second ADU under KCC 15.08.250 and Washington RCW 36.70A.696. School impact fees for the Kent School District still apply at the standard rate.

What fees do I still owe for a Kent ADU?

Building permit (scaled to construction valuation), plan review, plumbing, gas, and mechanical permits through MyBuildingPermit.com, plus an electrical permit from Washington L&I. Water meter or side-sewer connection fees apply only if you add a new service. Stormwater fees apply if new impervious surface exceeds the threshold in KCC Title 7.

Compare other topics

See how Bellevue and Kent compare on other ordinance categories.

Want to add a third city?

Use our full comparison tool to compare up to three cities.

Open Comparison Tool