☀️ Solar Energy/Panel Permits

Panel Permits: Bostonia vs El Cajon

How do panel permits rules compare between Bostonia, CA and El Cajon, CA?

Bostonia and El Cajon have similar restriction levels.

Bostonia, CA

San Diego County

Few Restrictions

Solar PV installation in unincorporated San Diego County requires a building permit from County PDS. California AB 1236 mandates streamlined permitting. The County waives plan check and permit fees for residential solar PV. Online permitting available through Citizen Access portal.

View full Bostonia rules →

El Cajon, CA

San Diego County

Few Restrictions

El Cajon offers a streamlined, ministerial solar photovoltaic permit process as required by California AB 2188 and SB 1222. Residential rooftop solar systems meeting standard criteria are processed over-the-counter. The city cannot impose unreasonable conditions that increase costs.

View full El Cajon rules →

Key Facts Comparison

FactBostoniaEl Cajon
Permit RequiredYes — building permit-
FeesPlan check and permit fees waived-
Online SubmissionAvailable via Citizen Access portal-
State LawAB 1236 — streamlined process-
Fire CodeRoof access pathways required-
Process-Streamlined — ministerial review
Residential Rooftop-Over-the-counter eligible
State Laws-AB 2188 and SB 1222
Max Size (OTC)-Up to 15 kW standard
Contact-Building Division — 619-441-1726

Highlighted rows indicate differences between cities.

Bostonia FAQ

How do I get a solar panel permit in San Diego County?

Apply through the County's online Citizen Access portal. Plan check and permit fees are waived for residential solar PV. The process is streamlined per state law AB 1236.

How much does the solar permit cost?

The County waives plan check and permit fees for residential solar PV installations, making the permit essentially free.

How long does the permitting process take?

Streamlined permitting under AB 1236 is designed for quick turnaround. Simple residential rooftop systems may be approved within days. More complex installations may take longer.

El Cajon FAQ

How do I get a solar permit in El Cajon?

Submit a standard application with site plan and equipment specs to the Building Division. Qualifying residential rooftop systems are processed over-the-counter under the streamlined process.

How long does the solar permit process take?

California law requires cities to process residential solar permits within 3 business days. Most qualifying systems are approved over-the-counter at the Building Division.

Do I need a permit for a small solar system?

Yes. All solar photovoltaic installations require a building and electrical permit. The process is streamlined for residential rooftop systems per state law.