Panel Permits: Bostonia vs San Diego
How do panel permits rules compare between Bostonia, CA and San Diego, CA?
Bostonia has fewer restrictions than San Diego.
Bostonia, CA
San Diego County
Solar PV installation in unincorporated San Diego County requires a building permit from County PDS. California AB 1236 mandates streamlined permitting. The County waives plan check and permit fees for residential solar PV. Online permitting available through Citizen Access portal.
View full Bostonia rules →San Diego, CA
San Diego County
A permit is required to install rooftop solar photovoltaic (PV) systems in San Diego. Rooftop-mounted systems on single-family homes and duplexes go through a streamlined permitting process. Ground-mounted systems, new support structures (carports, shade structures), or installations requiring structural modifications need a standard building permit. Solar energy systems are exempt from mechanical equipment screening provisions per SDMC §142.0905 and may be placed in side and rear yards.
View full San Diego rules →Key Facts Comparison
| Fact | Bostonia | San Diego |
|---|---|---|
| Permit Required | Yes — building permit | - |
| Fees | Plan check and permit fees waived | - |
| Online Submission | Available via Citizen Access portal | - |
| State Law | AB 1236 — streamlined process | - |
| Fire Code | Roof access pathways required | - |
| Permit | - | Required; streamlined process for rooftop residential |
| Screening Exempt | - | SDMC §142.0905 exempts solar from screening |
| Yard Placement | - | Allowed in side and rear yards |
| Ground Mount | - | Standard building permit required |
| Battery Storage | - | Separate permit may be required |
Highlighted rows indicate differences between cities.
Bostonia FAQ
How do I get a solar panel permit in San Diego County?
Apply through the County's online Citizen Access portal. Plan check and permit fees are waived for residential solar PV. The process is streamlined per state law AB 1236.
How much does the solar permit cost?
The County waives plan check and permit fees for residential solar PV installations, making the permit essentially free.
How long does the permitting process take?
Streamlined permitting under AB 1236 is designed for quick turnaround. Simple residential rooftop systems may be approved within days. More complex installations may take longer.
San Diego FAQ
How do I get a solar panel permit in San Diego?
Rooftop systems on single-family homes use a streamlined permit process through the City's Development Services Department. Apply online or at the permit counter.
Can I put solar panels on a new carport?
Yes, but new carport structures to support solar panels require a standard building permit in addition to the solar permit.
Compare other topics
See how Bostonia and San Diego compare on other ordinance categories.
Want to add a third city?
Use our full comparison tool to compare up to three cities.
Open Comparison Tool