Skip to main content
CityRuleLookup
πŸ—οΈ Accessory Structures/ADU Impact Fees

ADU Impact Fees: Castaic vs Long Beach

How do adu impact fees rules compare between Castaic, CA and Long Beach, CA?

Castaic, CA

Los Angeles County

No data available yet for Castaic.

Long Beach, CA

Los Angeles County

Few Restrictions

Under California Government Code Section 65852.2(f) and LBMC Section 21.45.400, Long Beach cannot charge development impact fees on ADUs under 750 square feet. ADUs 750 sq ft or larger pay fees proportional to the primary dwelling.

View full Long Beach rules β†’

Key Facts Comparison

FactCastaicLong Beach
Code Section-Cal. Gov Code 65852.2(f)
Under 750 sq ft-No impact fees
750+ sq ft-Proportional fees
Separate Meter-Optional
School Fees-Same state preemption

Highlighted rows indicate differences between cities.

Castaic FAQ

No FAQs available.

Long Beach FAQ

Do I pay impact fees on a Long Beach ADU under 750 sq ft?

No. Cal. Gov Code 65852.2(f) prohibits local impact fees on ADUs under 750 sq ft. Only plan check, building permit, and inspection fees apply.

Do I need a separate water meter for my Long Beach ADU?

No. Long Beach Water cannot require a separate water or sewer meter. A separate meter is optional and billed at the standard hookup rate if requested.

What if Long Beach charges me illegal ADU fees?

Appeal to the Building Official and file a complaint with the California HCD ADU Ombudsperson, which enforces Cal. Gov Code 65852.2(f) statewide.

Compare other topics

See how Castaic and Long Beach compare on other ordinance categories.

Want to add a third city?

Use our full comparison tool to compare up to three cities.

Open Comparison Tool