Skip to main content
CityRuleLookup
πŸ—οΈ Accessory Structures/ADU Permits

ADU Permits: Chandler vs Peoria

How do adu permits rules compare between Chandler, AZ and Peoria, AZ?

Chandler and Peoria have similar restriction levels.

Chandler, AZ

Maricopa County

Few Restrictions

Chandler permits accessory dwelling units by-right under Arizona Revised Statutes section 9-461.18, enacted by HB 2720 in 2024 and effective for cities over 75,000 population on or before January 1, 2025. Chandler's Land Use and Zoning Code (City Code Chapter 35) was amended in late 2024 to comply. Single-family lots may have one detached and one attached ADU; lots over one acre may add a third detached ADU.

View full Chandler rules β†’

Peoria, AZ

Maricopa County

Few Restrictions

Peoria permits accessory dwelling units (often locally called casitas) by-right under Arizona Revised Statutes section 9-461.18, enacted by HB 2720 in 2024 and effective for cities over 75,000 population on or before January 1, 2025. Peoria (population approximately 190,000) is subject to the mandate. The Peoria Zoning Ordinance (PZO) Article 14-2 (Residential Districts) was amended to comply. Single-family lots may have one detached and one attached ADU; lots over one acre may add a third detached unit.

View full Peoria rules β†’

Key Facts Comparison

FactChandlerPeoria
State MandateAriz. Rev. Stat. 9-461.18 (HB 2720)Ariz. Rev. Stat. 9-461.18 (HB 2720)
City CodeChandler Code Chapter 35 (amended 2024)-
Units Allowed1 detached + 1 attached (3 if 1+ acre)1 detached + 1 attached (3 if 1+ acre)
Permit AuthorityChandler Development ServicesPeoria Development and Engineering
Building Code2024 IRC / IFGC as adopted-
By-Right StandardYes on single-family lotsYes on single-family lots
City Reference-Peoria Zoning Ordinance Article 14-2
Maximum Size-75% of primary or 1,000 sq ft

Highlighted rows indicate differences between cities.

Chandler FAQ

Can I build an ADU in Chandler by-right?

Yes. Under Arizona HB 2720 (Ariz. Rev. Stat. 9-461.18), Chandler must allow one detached and one attached ADU by-right on every single-family lot. Lots over one acre may add a third detached unit. Building, plumbing, and electrical permits through Chandler Development Services are still required.

How long does ADU permitting take in Chandler?

Plan review for a standard residential ADU runs approximately two to six weeks at Chandler Development Services, depending on plan completeness and current workload. Construction inspections occur at standard milestones before final certificate of occupancy is issued.

Peoria FAQ

Can I build a casita ADU in Peoria by-right?

Yes. Under Arizona HB 2720 (Ariz. Rev. Stat. 9-461.18), Peoria must allow one detached and one attached ADU by-right on every single-family lot. Lots over one acre may add a third detached unit. Building, plumbing, electrical, and fuel-gas permits through Peoria Development and Engineering are still required.

How big can my Peoria ADU be?

Under ARS 9-461.18, your ADU may not exceed 75% of the gross floor area of the primary dwelling or 1,000 square feet, whichever is less. Setback, height, and lot-coverage standards from Peoria's residential zoning district still apply to the structure itself.

Compare other topics

See how Chandler and Peoria compare on other ordinance categories.

Want to add a third city?

Use our full comparison tool to compare up to three cities.

Open Comparison Tool