Erosion Control: Chino vs Rancho Cucamonga

How do erosion control rules compare between Chino, CA and Rancho Cucamonga, CA?

Chino has fewer restrictions than Rancho Cucamonga.

Chino, CA

San Bernardino County

Some Restrictions

Construction sites in Chino must implement erosion and sediment control Best Management Practices (BMPs) under the San Bernardino MS4 Permit (Order R8-2010-0036), California Building Code Appendix J (grading), and β€” for sites disturbing 1 acre or more β€” the statewide Construction General Permit (Order 2022-0057-DWQ). BMPs must keep sediment, concrete slurry, and construction debris out of Chino's storm drains and creeks year-round, with intensified controls during the October 1 – April 30 wet season.

View full Chino rules β†’

Rancho Cucamonga, CA

San Bernardino County

Heavy Restrictions

Rancho Cucamonga requires erosion control plans for grading over 50 cubic yards per Municipal Code Title 19. Plans must include BMPs effective through the October 1 to April 30 rainy season.

View full Rancho Cucamonga rules β†’

Key Facts Comparison

FactChinoRancho Cucamonga
Local triggerGrading permit (CBC Appendix J) for any project moving 50+ cubic yards or disturbing 5,000+ sq ft-
State trigger1 acre disturbance = Construction General Permit + SWPPP-
Wet seasonOctober 1 – April 30 (heightened BMP requirements)-
Slope ratioCuts/fills no steeper than 2:1 horizontal:vertical without engineered design-
Penalty ceiling$10,000/day under Cal. Water Code Β§13385-
Threshold-50 cubic yards
Rainy season-Oct 1 to Apr 30
Plan required-Civil engineer
Citation start-500 dollars
Contact-(909) 477-2740

Highlighted rows indicate differences between cities.

Chino FAQ

Do I need a SWPPP for a single-family house?

Only if the project disturbs 1 acre or more of soil. Smaller lots still need erosion control BMPs (silt fence, inlet protection, stabilized entrance) per Chino's grading permit, but the state SWPPP is not required.

What are wet-season grading restrictions in Chino?

From October 1 through April 30, Chino requires enhanced BMPs β€” covered stockpiles, perimeter controls in place before rain events, and limits on the area of bare soil. Construction General Permit sites must conduct pre-storm, storm, and post-storm inspections.

Can I wash out a concrete truck on my Chino lot?

Only into a designated, lined concrete washout containment β€” never on bare soil, gutter, or storm drain. Concrete washwater (high pH) is an illicit discharge enforceable by the Santa Ana Water Board.

Who issues grading permits in Chino?

Chino Building & Safety / Engineering issues grading permits under Title 15 (California Building Code Appendix J as adopted). Phone (909) 334-3253.

Rancho Cucamonga FAQ

Do I need erosion control for a small backyard project?

Projects under 50 cubic yards typically do not require a formal plan, but basic BMPs like silt fencing are still recommended during storms.

What if I start building in summer and finish after October 1?

You must have all erosion control BMPs installed and maintained by October 1, regardless of project completion status.