Permit Requirements: Costa Mesa vs Fullerton

How do permit requirements rules compare between Costa Mesa, CA and Fullerton, CA?

Costa Mesa and Fullerton have similar restriction levels.

Costa Mesa, CA

Orange County

Some Restrictions

Costa Mesa requires building permits for all new fences. The Planning Division reviews fence location and materials. Fences exceeding maximum heights require discretionary review. Temporary construction fencing also requires permits.

View full Costa Mesa rules β†’

Fullerton, CA

Orange County

Some Restrictions

Fullerton generally requires a building permit for fences and walls over a certain height. Fences up to 6 feet in side and rear yards and retaining walls up to 4 feet typically fall under standard permit exemptions per the California Building Code, but must still comply with zoning requirements reviewed by the Planning Division.

View full Fullerton rules β†’

Key Facts Comparison

FactCosta MesaFullerton
Permit RequiredYes β€” for all new fences-
Planning ReviewLocation and materials checked-
Over-HeightDiscretionary review required-
Temp FencingPermit needed if >30 days-
ContactBuilding Division β€” (714) 754-5273-
Building Permit-Exempt if under 7 feet (CBC)
Zoning Compliance-Required regardless of permit exemption
Retaining Walls-Permit needed over 4 feet
Pool Barriers-Separate permit and inspection
Community Dev-(714) 738-6837

Highlighted rows indicate differences between cities.

Costa Mesa FAQ

Do I need a permit for a fence in Costa Mesa?

Yes. All new fences require building permits. The Planning Division reviews location and materials. Contact Building at (714) 754-5273.

What about a temporary fence during construction?

If construction exceeds 30 days, a permit is required for temporary fencing that specifies the completion timeline.

What if my fence needs to be taller than the limit?

Fences exceeding maximum height limits require discretionary review through the Planning Division.

Fullerton FAQ

Do I need a permit for a 6-foot fence in Fullerton?

A 6-foot fence in the side or rear yard is typically exempt from a building permit under the California Building Code but must still comply with Fullerton's zoning height limits. No separate building permit is usually needed if it meets zoning requirements.

When do I need a permit for a retaining wall in Fullerton?

Retaining walls over 4 feet in height measured from the bottom of the footing require a building permit with engineered plans. Walls 4 feet or under are generally exempt.

Do pool fences need a permit in Fullerton?

Pool barrier fencing must meet California Building Code safety requirements and typically requires a pool barrier permit and inspection. Contact Community Development at (714) 738-6837.

Compare other topics

See how Costa Mesa and Fullerton compare on other ordinance categories.

Want to add a third city?

Use our full comparison tool to compare up to three cities.

Open Comparison Tool