Skip to main content
CityRuleLookup
☀️ Solar Energy/Panel Permits

Panel Permits: Daly City vs San Mateo

How do panel permits rules compare between Daly City, CA and San Mateo, CA?

Daly City and San Mateo have similar restriction levels.

Daly City, CA

San Mateo County

Few Restrictions

Unincorporated San Mateo County uses expedited solar permitting under California AB 2188 (Solar Rights Act). Residential rooftop systems under 10 kW qualify for same-day online permits through SolarAPP+ or the County Building Division. Fire setbacks per CFC Chapter 11B.

View full Daly City rules →

San Mateo, CA

San Mateo County

Few Restrictions

San Mateo provides streamlined solar permitting as required by AB 2188 and SB 1222. Residential rooftop systems meeting standard criteria receive ministerial (non-discretionary) approval. The city processes solar permits within the required 3-business-day timeframe.

View full San Mateo rules →

Key Facts Comparison

FactDaly CitySan Mateo
Permit Fee Cap$450 residential-
System SizeUnder 10 kW expedited-
Fire Setback3 ft ridge, 18 in sides-
State LawAB 2188 / Civil Code §714-
UtilityPG&E NEM 3.0-
Process-Streamlined — ministerial
Timeline-3 business days per state law
State Laws-AB 2188 and SB 1222
Inspection-Required after installation
Contact-Building Division — 650-522-7200

Highlighted rows indicate differences between cities.

Daly City FAQ

Who enforces panel permits rules in San Mateo County?

San Mateo County's code enforcement division is responsible for solar energy ordinances. You can report violations or request information through the San Mateo County government website or by calling the main municipal line.

What are typical penalties for violating panel permits rules?

Most San Mateo County solar energy violations start with a written warning followed by escalating civil fines for repeat offenses. Specific dollar amounts and any criminal-misdemeanor exposure depend on the section of code; consult San Mateo County's municipal code or staff for the current penalty schedule.

San Mateo FAQ

How do I get a solar permit in San Mateo?

Submit a standard application to the Building Division. Qualifying residential rooftop systems are processed ministerially within 3 business days.

How long does it take?

State law requires processing within 3 business days for qualifying residential systems.

Do I need a permit for any solar system?

Yes. All PV installations require building and electrical permits. The process is streamlined for qualifying residential rooftop systems.

Compare other topics

See how Daly City and San Mateo compare on other ordinance categories.

Want to add a third city?

Use our full comparison tool to compare up to three cities.

Open Comparison Tool