Permit Requirements: Downey vs West Covina
How do permit requirements rules compare between Downey, CA and West Covina, CA?
Downey and West Covina have similar restriction levels.
Downey, CA
Los Angeles County
Fences over 42 inches require a building permit in Downey. Fences at or below 42 inches still need Planning and possibly Engineering approval. Street side yard fences up to 7 ft allowed with 3 ft setback from property line.
View full Downey rules βWest Covina, CA
Los Angeles County
Fence construction in West Covina may require a building permit depending on height and type. Plans must comply with the zoning code setback and height requirements. Contact Building Division for specifics.
View full West Covina rules βKey Facts Comparison
| Fact | Downey | West Covina |
|---|---|---|
| Permit Threshold | Over 42 inches | - |
| Under 42 in | Planning approval still needed | - |
| Street Side | Up to 7 ft with 3 ft setback | - |
| Corner Cutback | 30-inch max for visibility | - |
| Permit | - | May be required based on height/type |
| Code | - | Ch. 26 Zoning / Ch. 7 Building |
| Height Limits | - | Vary by zone (front vs side/rear) |
| Contact | - | Building Division 626-939-8434 |
Highlighted rows indicate differences between cities.
Downey FAQ
Do I need a permit to build a fence in Downey?
Fences over 42 inches require a building permit in Downey. Fences at or below 42 inches still need Planning and possibly Engineering approval. Street side yard fences up to 7 ft allowed with 3 ft setback from property line.
How much does a fence permit cost in Downey?
Permit Threshold: Over 42 inches. Under 42 in: Planning approval still needed. Street Side: Up to 7 ft with 3 ft setback. Corner Cutback: 30-inch max for visibility.
West Covina FAQ
Do I need a permit to build a fence in West Covina?
Fence construction in West Covina may require a building permit depending on height and type. Plans must comply with the zoning code setback and height requirements. Contact Building Division for specifics.
How much does a fence permit cost in West Covina?
Permit: May be required based on height/type. Code: Ch. 26 Zoning / Ch. 7 Building. Height Limits: Vary by zone (front vs side/rear). Contact: Building Division 626-939-8434.
Compare other topics
See how Downey and West Covina compare on other ordinance categories.
Want to add a third city?
Use our full comparison tool to compare up to three cities.
Open Comparison Tool