Dunedin vs Seminole
How do rainwater harvesting rules compare between Dunedin, FL and Seminole, FL?
Dunedin and Seminole have similar restriction levels.
Dunedin, FL
Pinellas County
Rainwater harvesting is legal and encouraged in Dunedin. The city and SWFWMD promote rain barrels as a conservation tool, and there are no Dunedin-specific prohibitions, though structural cisterns may require building permits.
View full Dunedin rules →Seminole, FL
Pinellas County
Seminole, FL permits residential rainwater harvesting for non-potable use such as irrigation. The City does not require a permit for typical rain barrels, though larger cisterns and any potable connection require Building Department review.
View full Seminole rules →Key Facts Comparison
| Fact | Dunedin | Seminole |
|---|---|---|
| Permit needed | Plumbed or large cisterns | - |
| Small barrels | Generally no permit | - |
| Inlet rule | Debris screen required | - |
| Overflow | Must be properly sized | - |
| HOA protection | FFL statute applies | - |
| Rain barrels | - | Allowed without permit |
| Large cistern threshold | - | Over 5,000 gallons triggers review |
| Indoor plumbing | - | Permit and backflow required |
| Use restriction | - | Non-potable irrigation typical |
| Mosquito control | - | Sealed lid required |
Highlighted rows indicate differences between cities.
Dunedin FAQ
Do I need a permit for a rain barrel in Dunedin?
A standard 50- to 60-gallon rain barrel under a downspout does not require a permit. Permits apply if you plumb the system into household irrigation or install large above-ground cisterns.
Can my HOA ban rain barrels in Dunedin?
Florida-Friendly Landscaping statute Sec. 373.185 limits HOAs from prohibiting reasonable conservation features including rain barrels, though they may impose neutral aesthetic standards on placement.
Seminole FAQ
Can I install a rain barrel at my Seminole home?
Yes. Standard residential rain barrels for landscape irrigation are allowed without a permit. Use a sealed lid and a screen on the inlet to prevent mosquito breeding.
Do I need a permit for a large cistern?
Cisterns above roughly 5,000 gallons or any system connected to indoor plumbing require a Building Department permit, structural review, and a backflow prevention device.
Compare other topics
See how Dunedin and Seminole compare on other ordinance categories.
Want to add a third city?
Use our full comparison tool to compare up to three cities.
Open Comparison Tool