Solar panel installations in Evanston require a building permit and electrical permit. The city actively promotes solar through its participation in the Illinois Solar for All program and community solar initiatives. Historic district properties require Historic Preservation Commission review. Illinois law protects solar access rights.
View full Evanston rules →Orland Park, IL
Cook County
Orland Park requires a building permit and electrical permit for installation of solar photovoltaic systems. Roof-mounted residential systems are generally permitted by right in residential zones under the Illinois Solar Rights Act. Permit review covers structural, electrical, fire access, and interconnection requirements. ComEd net metering interconnection is processed separately.
View full Orland Park rules →Key Facts Comparison
| Fact | Evanston | Orland Park |
|---|---|---|
| Permits Required | Building + electrical | - |
| Solar Access Law | 765 ILCS 165 protects access | - |
| Net Metering | Available via ComEd under 25 kW | - |
| Historic Districts | HPC review required | - |
| Community Dev | (847) 448-4311 | - |
| Permit | - | Required (building + electrical) |
| Roof PV | - | Generally by-right |
| Code Reference | - | NEC 690 / 705 |
| Interconnection | - | ComEd separate process |
| State Law | - | Illinois Solar Rights Act |
Highlighted rows indicate differences between cities.
Evanston FAQ
Do I need a permit for solar panels in Evanston?
Yes. Both a building permit and electrical permit are required. Apply through Community Development at (847) 448-4311. Properties in historic districts also need Historic Preservation Commission approval.
Does Evanston offer solar incentives?
Evanston participates in the Illinois Solar for All program for qualifying households. The Illinois Adjustable Block Program provides SRECs. ComEd offers net metering for residential systems under 25 kW.
Can my neighbor block my solar panels with a new building?
Illinois Solar Collector Privilege Act (765 ILCS 165) protects your right to solar access by preventing adjacent property owners from obstructing existing solar collectors with new construction.
Orland Park FAQ
Do I need a permit for solar panels in Orland Park?
Yes. Building and electrical permits are required for any PV system installation. Roof-mounted residential systems are generally permitted by right in residential zones.
Can my HOA stop me from installing solar?
The Illinois Solar Rights Act (765 ILCS 165) significantly limits HOA restrictions on solar. HOAs may impose reasonable restrictions on placement and aesthetics but cannot prohibit functional installations.
How long does the permit take?
Typical review is 2 to 4 weeks for standard residential rooftop systems. ComEd interconnection adds additional time. Choose an installer experienced with Orland Park permitting.
Compare other topics
See how Evanston and Orland Park compare on other ordinance categories.
Want to add a third city?
Use our full comparison tool to compare up to three cities.
Open Comparison Tool