Panel Permits: Fair Oaks vs Sacramento
How do panel permits rules compare between Fair Oaks, CA and Sacramento, CA?
Fair Oaks has fewer restrictions than Sacramento.
Fair Oaks, CA
Sacramento County
Sacramento County offers expedited residential solar permits under AB 2188 and SB 379, with online submittal and typical approval within 1-3 business days for standard rooftop systems. Title 24 (2020) Solar Mandate requires solar on most new single-family homes. SMUD handles interconnection for its service territory; PG&E for the rest.
View full Fair Oaks rules →Sacramento, CA
Sacramento County
Sacramento requires building permits for solar panel installations under City Code Title 15 and complies with the California Solar Permitting Guidebook (AB 2188) for streamlined residential solar permitting. Residential rooftop solar systems up to 10 kW qualify for an expedited over-the-counter permit process. The Sacramento Municipal Utility District (SMUD) provides net metering and interconnection services for solar customers.
View full Sacramento rules →Key Facts Comparison
| Fact | Fair Oaks | Sacramento |
|---|---|---|
| Permit | 1-3 days (AB 2188/SB 379) | - |
| Title 24 | Solar required on new homes | - |
| Utility | SMUD or PG&E | SMUD provides net metering and interconnection |
| Threshold | Under 10 kW expedited | - |
| NEM | NEM 3.0 (PG&E) or SSR (SMUD) | - |
| Code Section | - | Sacramento City Code Title 15, AB 2188 |
| Streamlined Permits | - | Residential systems up to 10 kW qualify |
| Processing Time | - | 1-3 business days for qualifying systems |
| New Construction | - | Solar required on new homes (Title 24) |
Highlighted rows indicate differences between cities.
Fair Oaks FAQ
Do I need a permit to add solar?
Yes, an electrical/building permit is required. Sacramento County uses a streamlined process with typical approval in 1-3 business days.
Does Title 24 require me to add solar?
The mandate applies to new construction and certain major additions/remodels after January 1, 2020. Existing homes without alterations are not required to retrofit.
Sacramento FAQ
How long does it take to get a solar permit in Sacramento?
Qualifying residential rooftop solar systems up to 10 kW can receive an expedited permit within 1-3 business days through Sacramento's streamlined process under AB 2188.
Do new homes in Sacramento need solar panels?
Yes. California's Title 24 Building Energy Efficiency Standards require solar panels on most new residential construction built since January 2020.
Compare other topics
See how Fair Oaks and Sacramento compare on other ordinance categories.
Want to add a third city?
Use our full comparison tool to compare up to three cities.
Open Comparison Tool