ADU Impact Fees: Fairfield vs Vacaville
How do adu impact fees rules compare between Fairfield, CA and Vacaville, CA?
Fairfield and Vacaville have similar restriction levels.
Fairfield, CA
Solano County
ADUs under 750 sq ft are exempt from all city development impact fees in Fairfield under California Gov Code §65852.2(f)(3). ADUs 750 sq ft and larger pay impact fees proportional to the primary dwelling, capped at the ratio of the ADU's square footage to the primary's square footage.
View full Fairfield rules →Vacaville, CA
Solano County
Under California Government Code 66322(a) (formerly 65852.2(f)(3)) and VMC 14.09.122, Vacaville ADUs under 750 square feet are exempt from all city impact fees. ADUs 750 sq ft and larger pay impact fees proportional to the ratio of ADU floor area to primary dwelling area. Standard building, plan-check, and utility connection fees still apply at any size.
View full Vacaville rules →Key Facts Comparison
| Fact | Fairfield | Vacaville |
|---|---|---|
| Under 750 sq ft | No impact fees | - |
| 750+ sq ft | Proportional to primary | - |
| School Fees | ADUs ≥500 sq ft only | Waived under 750 sq ft |
| Permit/Plan Check | Still applies (not impact) | - |
| Legal Basis | Gov §65852.2(f)(3) | - |
| Plan-Check Range | ~$1,500-$7,500 typical | - |
| Authority | - | Gov. Code 66322(a) (formerly 65852.2(f)(3)) |
| Sub-750 sq ft ADU | - | Exempt from all city impact fees |
| 750+ sq ft ADU | - | Proportional impact fees |
| Refund Window | - | 90 days (Gov. Code 66020) |
Highlighted rows indicate differences between cities.
Fairfield FAQ
Is the water connection fee waived for a small ADU in Fairfield?
If the ADU shares the primary residence's existing water connection, no new connection fee can be charged. A new separate connection (rare for ADUs under 750 sq ft) would trigger the standard hookup charge from the relevant water utility.
Do I have to pay the Fairfield-Suisun school district fee for my 600 sq ft ADU?
No. School impact fees apply only to ADUs 500 sq ft or larger by state law, but Fairfield's practice and many ADU advocates note that even ADUs above 500 sq ft are sometimes waived; confirm with the school district facilities office before paying.
Vacaville FAQ
Are Vacaville ADUs charged impact fees?
ADUs under 750 sq ft are exempt from all city impact fees under California Government Code 66322(a) (formerly 65852.2(f)(3)). This includes Capital Facilities, Park, Traffic Impact, and Vacaville Unified School District facility fees. ADUs 750 sq ft and larger pay proportional fees based on size relative to the primary dwelling.
What does a Vacaville ADU cost to permit?
Permit and plan-check fees vary by valuation under Vacaville's Master Fee Schedule, typically $5,000-$10,000 for a detached ADU plus utility connection fees. Sub-750 sq ft ADUs are exempt from impact fees but still pay these permit fees plus PG&E electrical service upgrades and water/sewer connection charges through Vacaville Public Works Utilities.
Compare other topics