Skip to main content
CityRuleLookup
☀️ Solar Energy/Panel Permits

Panel Permits: Florin vs Sacramento

How do panel permits rules compare between Florin, CA and Sacramento, CA?

Florin has fewer restrictions than Sacramento.

Florin, CA

Sacramento County

Few Restrictions

Sacramento County offers expedited residential solar permits under AB 2188 and SB 379, with online submittal and typical approval within 1-3 business days for standard rooftop systems. Title 24 (2020) Solar Mandate requires solar on most new single-family homes. SMUD handles interconnection for its service territory; PG&E for the rest.

View full Florin rules →

Sacramento, CA

Sacramento County

Some Restrictions

Sacramento requires building permits for solar panel installations under City Code Title 15 and complies with the California Solar Permitting Guidebook (AB 2188) for streamlined residential solar permitting. Residential rooftop solar systems up to 10 kW qualify for an expedited over-the-counter permit process. The Sacramento Municipal Utility District (SMUD) provides net metering and interconnection services for solar customers.

View full Sacramento rules →

Key Facts Comparison

FactFlorinSacramento
Permit1-3 days (AB 2188/SB 379)-
Title 24Solar required on new homes-
UtilitySMUD or PG&ESMUD provides net metering and interconnection
ThresholdUnder 10 kW expedited-
NEMNEM 3.0 (PG&E) or SSR (SMUD)-
Code Section-Sacramento City Code Title 15, AB 2188
Streamlined Permits-Residential systems up to 10 kW qualify
Processing Time-1-3 business days for qualifying systems
New Construction-Solar required on new homes (Title 24)

Highlighted rows indicate differences between cities.

Florin FAQ

Do I need a permit to add solar?

Yes, an electrical/building permit is required. Sacramento County uses a streamlined process with typical approval in 1-3 business days.

Does Title 24 require me to add solar?

The mandate applies to new construction and certain major additions/remodels after January 1, 2020. Existing homes without alterations are not required to retrofit.

Sacramento FAQ

How long does it take to get a solar permit in Sacramento?

Qualifying residential rooftop solar systems up to 10 kW can receive an expedited permit within 1-3 business days through Sacramento's streamlined process under AB 2188.

Do new homes in Sacramento need solar panels?

Yes. California's Title 24 Building Energy Efficiency Standards require solar panels on most new residential construction built since January 2020.

Compare other topics

See how Florin and Sacramento compare on other ordinance categories.

Want to add a third city?

Use our full comparison tool to compare up to three cities.

Open Comparison Tool