Skip to main content
CityRuleLookup
πŸ—οΈ Accessory Structures/Shed Rules

Shed Rules: Grand Rapids vs Kentwood

How do shed rules rules compare between Grand Rapids, MI and Kentwood, MI?

Grand Rapids and Kentwood have similar restriction levels.

Grand Rapids, MI

Kent County

Some Restrictions

Small sheds under 200 sq ft may not require a building permit in Grand Rapids, but must comply with zoning setbacks. Larger accessory structures require both zoning and building permits.

View full Grand Rapids rules β†’

Kentwood, MI

Kent County

Some Restrictions

Michigan applies the Stille-DeRossett-Hale Construction Code Act statewide. Detached accessory sheds 200 square feet or smaller are exempt from state building permits under the residential code.

View full Kentwood rules β†’

Key Facts Comparison

FactGrand RapidsKentwood
Permit ExemptUnder 200 sq ft, single story-
SetbacksZoning setbacks apply to all sizes-
LocationSide or rear yard only-
Lot CoverageMust comply with zoning maximums-
Code Act-MCL 125.1501 et seq.
Permit Exemption-200 sq ft or less
Local Zoning-Setbacks still apply
Trade Permits-Always required

Highlighted rows indicate differences between cities.

Grand Rapids FAQ

Do I need a permit for a shed in Grand Rapids?

Sheds under 200 sq ft generally do not need a building permit but must comply with zoning setbacks. Larger structures require a building permit. All sheds must be in side or rear yards.

How close can a shed be to my Grand Rapids property line?

Sheds must comply with zoning setbacks from property lines regardless of size. Exact setbacks depend on your zoning district, so check the zoning ordinance before placing a shed.

Can I run electricity to my Grand Rapids shed?

Yes, but electrical additions require a separate permit. The work must be done or inspected to code even if the shed itself is under the 200 sq ft permit threshold.

Kentwood FAQ

Do I need a Michigan building permit for a small shed?

No. The Michigan Residential Code exempts detached one-story sheds 200 square feet or smaller. Larger structures require a building permit through your local enforcing agency.

Can a Michigan city require permits for sheds under 200 sq ft?

Cities cannot require building permits below the state threshold, but they may require zoning permits for placement, setbacks, and accessory-structure registration under local ordinance.

Does the shed exemption apply to electrical wiring?

No. Adding electricity, plumbing, or mechanical systems to any shed requires separate trade permits and inspections under the Michigan Construction Code regardless of structure size.

Compare other topics

See how Grand Rapids and Kentwood compare on other ordinance categories.

Want to add a third city?

Use our full comparison tool to compare up to three cities.

Open Comparison Tool