Gresham and Troutdale have similar restriction levels.

Gresham, OR

Multnomah County

Some Restrictions

Portland requires grading permits under PCC Title 24 for excavation or fill exceeding 50 cubic yards or slopes over 20%. Portland's Landslide Hazard areas (West Hills) require geotechnical reports. Drainage cannot be redirected onto neighboring properties (ORS 105.170). Retaining walls over 4 feet require engineered plans. Multnomah County Land Use requires grading permits in unincorporated areas on SEC overlay or steep slopes.

View full Gresham rules β†’

Troutdale, OR

Multnomah County

Some Restrictions

Portland requires grading permits under PCC Title 24 for excavation or fill exceeding 50 cubic yards or slopes over 20%. Portland's Landslide Hazard areas (West Hills) require geotechnical reports. Drainage cannot be redirected onto neighboring properties (ORS 105.170). Retaining walls over 4 feet require engineered plans. Multnomah County Land Use requires grading permits in unincorporated areas on SEC overlay or steep slopes.

View full Troutdale rules β†’

Key Facts Comparison

FactGreshamTroutdale
Portland Threshold50 cu yd / 20% slope50 cu yd / 20% slope
West HillsLandslide overlay geo reportLandslide overlay geo report
Retaining WallsPermit if >4 ftPermit if >4 ft
State LawORS 105.170 drainageORS 105.170 drainage
DSL PermitWetlands/salmon habitatWetlands/salmon habitat

Highlighted rows indicate differences between cities.

Gresham FAQ

Do I need a grading permit to regrade my yard?

Yes in Portland if you move over 50 cubic yards or work on slopes over 20%. Small gardening/landscaping is exempt. West Hills properties often require geotech reports for any earthwork.

Can I build a 3-foot retaining wall without a permit?

Under 4 feet typically exempt from structural permit under ORSC, but Portland still requires a zoning review if it affects setbacks or drainage. Always check with BDS.

Troutdale FAQ

Do I need a grading permit to regrade my yard?

Yes in Portland if you move over 50 cubic yards or work on slopes over 20%. Small gardening/landscaping is exempt. West Hills properties often require geotech reports for any earthwork.

Can I build a 3-foot retaining wall without a permit?

Under 4 feet typically exempt from structural permit under ORSC, but Portland still requires a zoning review if it affects setbacks or drainage. Always check with BDS.