EV Charging: Hesperia vs San Bernardino
How do ev charging rules compare between Hesperia, CA and San Bernardino, CA?
Hesperia and San Bernardino have similar restriction levels.
Hesperia, CA
San Bernardino County
EV charger permitting in Hesperia is preempted by California state law: AB 1236 (Gov. Code §65850.7) requires the City to use an expedited, ministerial permit process limited to health-and-safety review, and Civil Code §4745 forbids landlords from blocking tenant-funded charging stations (Civil Code §4745.1 applies to commercial tenants; §4716 applies to HOAs). New construction is subject to the EV-ready and EV-capable parking-space mandates in Title 24, Part 11 (CALGreen) of the California Building Code. Hesperia processes EVCS permits through ministerial Building Division review.
View full Hesperia rules →San Bernardino, CA
San Bernardino County
San Bernardino follows Title 24 EV charging mandates and CALGreen pre-wiring. Residential Level 2 chargers require an electrical permit, processed within the statewide 5-day expedited window.
View full San Bernardino rules →Key Facts Comparison
| Fact | Hesperia | San Bernardino |
|---|---|---|
| Permit framework | AB 1236 / Cal. Gov. Code §65850.7 - expedited ministerial review, health & safety only | - |
| Shot clocks (AB 970) | 5 business days (≤25 spaces) / 20 business days (larger projects) | - |
| Tenant right | Cal. Civil Code §4745 - landlords cannot bar tenant-funded EV chargers | - |
| HOA right | Cal. Civil Code §4716 - HOAs cannot block EV charging stations | - |
| New construction | CALGreen Title 24 Part 11 - EV-ready outlets/spaces required | - |
| State Mandate | - | Title 24 EV-ready wiring |
| Expedited Permit | - | Gov Code 65850.7 (5 business days) |
| HOA Protection | - | Civil Code 4745 |
| Commercial Accessibility | - | CBC 11B-812 |
| Utility Coordination | - | Southern California Edison |
Highlighted rows indicate differences between cities.
Hesperia FAQ
Do I need a permit to install a home EV charger in Hesperia?
Yes - a ministerial electrical permit from Hesperia Building and Safety, reviewed only for health and safety per Gov. Code §65850.7, with a 5-business-day shot clock under AB 970.
Can my landlord stop me from installing a charger?
No, if you pay for it and follow the conditions in Cal. Civil Code §4745 (licensed installer, insurance, etc.). Refusal exposes the landlord to a $1,000 civil penalty.
Are new Hesperia homes required to be EV-ready?
Yes - CALGreen Title 24 Part 11 requires at least one Level 2 (208/240V) EV-ready outlet for new single-family dwellings, and a share of EV-capable/ready spaces in new multifamily and hotel parking.
San Bernardino FAQ
Do I need a permit to install a Level 2 charger at my San Bernardino home?
Yes, an electrical permit is required for any new 240-volt circuit. California Government Code 65850.7 requires cities to expedite single-family EV charger permits within 5 business days with an online or streamlined process.
Can my San Bernardino HOA stop me from installing an EV charger?
No. Civil Code 4745 prohibits HOAs from unreasonably blocking installation of EV charging stations in exclusive-use parking areas. The HOA can set reasonable conditions on routing and insurance but cannot ban chargers outright.
Compare other topics
See how Hesperia and San Bernardino compare on other ordinance categories.
Want to add a third city?
Use our full comparison tool to compare up to three cities.
Open Comparison Tool