EV Charging: Moorpark vs Simi Valley
How do ev charging rules compare between Moorpark, CA and Simi Valley, CA?
Moorpark has fewer restrictions than Simi Valley.
Moorpark, CA
Ventura County
Moorpark supports EV charging with a streamlined permitting process and is piloting automated permitting through SolarAPP+ for eligible residential solar-and-storage projects. The city has published guidelines and checklists for residential and commercial EV charging station installations. Public EV chargers are available at city facilities.
View full Moorpark rules βSimi Valley, CA
Ventura County
Ventura County follows California's CALGreen Code requirements for electric vehicle charging infrastructure in new construction. AB 970 and updated Title 24 standards require EV-ready parking spaces in new residential and commercial developments in unincorporated areas.
View full Simi Valley rules βKey Facts Comparison
| Fact | Moorpark | Simi Valley |
|---|---|---|
| Permit Required | Level 2 (240V) installations | - |
| Level 1 Chargers | May not need permit | - |
| Automated Permitting | SolarAPP+ pilot program | - |
| CALGreen | EV-ready spaces for new commercial | - |
| Building & Safety | (805) 517-6272 | - |
| Single-Family Homes | - | Level 2 EV circuit required (new construction) |
| Circuit Minimum | - | 240-volt, 40-amp |
| Tenant Rights | - | AB 2565 protects installation requests |
| Permits | - | Code Enforcement (805) 654-2466 |
Highlighted rows indicate differences between cities.
Moorpark FAQ
Do I need a permit for a home EV charger in Moorpark?
Level 2 (240V) charger installations require an electrical permit from Building and Safety. A simple Level 1 (120V) charger plugged into an existing outlet typically does not require a permit.
Where are public EV chargers in Moorpark?
Public EV charging locations can be found on the US Department of Energy Alternative Fuels Station Locator at afdc.energy.gov or on the city's website at moorparkca.gov.
Does Moorpark require EV charging in new buildings?
Yes. California's CALGreen building code requires EV-ready parking spaces in new commercial and multifamily construction. Contact Building and Safety at (805) 517-6272 for current requirements.
Simi Valley FAQ
Do new homes in unincorporated Ventura County need EV charging capability?
Yes. Under CALGreen Code requirements, new single-family homes must include a Level 2 EV-capable circuit (240-volt, 40-amp minimum) in the garage or designated parking area. This is verified during the building permit process.
Can my landlord refuse to let me install an EV charger?
Under AB 2565, landlords of multi-family properties cannot unreasonably deny a tenant's written request to install EV charging equipment in their designated parking space. The tenant typically bears the installation cost.
What EV charging requirements apply to commercial buildings?
New commercial developments must designate a percentage of parking spaces as EV-capable per CALGreen Code requirements, with the number scaling based on total parking count. Contact the county building division at (805) 654-2466 for specific requirements.
Compare other topics
See how Moorpark and Simi Valley compare on other ordinance categories.
Want to add a third city?
Use our full comparison tool to compare up to three cities.
Open Comparison Tool