Skip to main content
CityRuleLookup
πŸ”§ Building Safety/Green Building Code

Green Building Code: Moreno Valley vs Palm Springs

How do green building code rules compare between Moreno Valley, CA and Palm Springs, CA?

Moreno Valley and Palm Springs have similar restriction levels.

Moreno Valley, CA

Riverside County

Some Restrictions

Riverside County enforces California Green Building Standards Code (CALGreen) Title 24 Part 11 alongside the county Climate Action Plan, requiring water efficiency, EV-ready wiring, and recycling at construction sites.

View full Moreno Valley rules β†’

Palm Springs, CA

Riverside County

Some Restrictions

Riverside County enforces California Green Building Standards Code (CALGreen) Title 24 Part 11 alongside the county Climate Action Plan, requiring water efficiency, EV-ready wiring, and recycling at construction sites.

View full Palm Springs rules β†’

Key Facts Comparison

FactMoreno ValleyPalm Springs
CodeTitle 24 Part 11Title 24 Part 11
Water reduction20% mandatory20% mandatory
Waste diversion65% C&D minimum65% C&D minimum
EV-readyNew residential wiringNew residential wiring

Highlighted rows indicate differences between cities.

Moreno Valley FAQ

Does CALGreen apply to small remodels?

CALGreen applies to additions and alterations meeting valuation or scope thresholds. Cosmetic repairs are exempt. Building and Safety provides a CALGreen checklist tied to permit type at intake.

What is required for EV-ready wiring?

New single-family homes need a 208/240V dedicated branch circuit raceway to a parking space sized for 40-amp service. Multifamily projects need a percentage of spaces wired or capable per Title 24.

Palm Springs FAQ

Does CALGreen apply to small remodels?

CALGreen applies to additions and alterations meeting valuation or scope thresholds. Cosmetic repairs are exempt. Building and Safety provides a CALGreen checklist tied to permit type at intake.

What is required for EV-ready wiring?

New single-family homes need a 208/240V dedicated branch circuit raceway to a parking space sized for 40-amp service. Multifamily projects need a percentage of spaces wired or capable per Title 24.

Want to add a third city?

Use our full comparison tool to compare up to three cities.

Open Comparison Tool