ADU Rules: Oakley vs Pittsburg
How do adu rules rules compare between Oakley, CA and Pittsburg, CA?
Pittsburg has fewer restrictions than Oakley.
Oakley, CA
Contra Costa County
Oakley complies with California Gov Code Β§65852.2 (statewide ADU law). Single-family lots may have one ADU plus one JADU. Maximum ADU size: 1,200 sq ft; no minimum lot size restriction. Setbacks: 4 ft from side/rear property lines (new detached ADU). Minimum height: 16 ft. ADUs under 750 sq ft are exempt from impact fees. ADU permit applications processed in 60 days maximum.
View full Oakley rules βPittsburg, CA
Contra Costa County
ADUs in Pittsburg follow statewide mandates under CA Gov Code 65852.2, AB 68, AB 881, SB 13, and AB 1033. All single-family and multifamily residential lots may add at least one ADU and one JADU. Minimum 4-foot side/rear setbacks, no replacement parking within 1/2 mile of transit, 60-day permit processing, and no impact fees under 750 sq ft.
View full Pittsburg rules βKey Facts Comparison
| Fact | Oakley | Pittsburg |
|---|---|---|
| Max ADU Size | 1,200 sq ft (detached) | - |
| Setbacks | 4 ft rear and side (new detached ADU) | - |
| Minimum Height | 16 ft for detached ADU | - |
| Impact Fees | Exempt for ADUs under 750 sq ft | - |
| - | - |
Highlighted rows indicate differences between cities.
Oakley FAQ
Can I build an ADU on my property in Oakley?
Oakley complies with California Gov Code Β§65852.2 (statewide ADU law). Single-family lots may have one ADU plus one JADU. Maximum ADU size: 1,200 sq ft; no minimum lot size restriction. Setbacks: 4 ft from side/rear property lines (new detached ADU). Minimum height: 16 ft. ADUs under 750 sq ft...
What are the size limits for an accessory dwelling unit in Oakley?
Max ADU Size: 1,200 sq ft (detached). Setbacks: 4 ft rear and side (new detached ADU). Minimum Height: 16 ft for detached ADU. Impact Fees: Exempt for ADUs under 750 sq ft.
Pittsburg FAQ
Can Pittsburg deny my ADU?
Not if it meets state standards. ADUs that comply with Gov Code 65852.2 must be ministerially approved. Cities can only impose objective design standards, not discretionary review.
Do I need to provide parking for my ADU?
Not if the ADU is within half a mile of high-quality transit or is part of an existing structure or garage conversion. Otherwise, one off-street space per unit or bedroom may be required.
How long does ADU approval take?
State law requires ministerial action within 60 days of a complete application. Plan check timing varies, and building permit inspections follow separately.
Compare other topics
See how Oakley and Pittsburg compare on other ordinance categories.
Want to add a third city?
Use our full comparison tool to compare up to three cities.
Open Comparison Tool