EV Charging: Ojai vs Simi Valley
How do ev charging rules compare between Ojai, CA and Simi Valley, CA?
Ojai has fewer restrictions than Simi Valley.
Ojai, CA
Ventura County
Ojai follows California's streamlined EV charging permit process under AB 1236. Level 1 and Level 2 home charger installations require an electrical permit but receive expedited review. The city has public charging stations at City Hall and the Ojai Valley Inn.
View full Ojai rules βSimi Valley, CA
Ventura County
Ventura County follows California's CALGreen Code requirements for electric vehicle charging infrastructure in new construction. AB 970 and updated Title 24 standards require EV-ready parking spaces in new residential and commercial developments in unincorporated areas.
View full Simi Valley rules βKey Facts Comparison
| Fact | Ojai | Simi Valley |
|---|---|---|
| Home Charger Permit | Electrical permit required, expedited | - |
| Sidewalk Cables | Prohibited | - |
| Public Chargers | City Hall, commercial locations | - |
| Multi-Family New Build | 10% EV-ready spaces (CALGreen) | - |
| Single-Family Homes | - | Level 2 EV circuit required (new construction) |
| Circuit Minimum | - | 240-volt, 40-amp |
| Tenant Rights | - | AB 2565 protects installation requests |
| Permits | - | Code Enforcement (805) 654-2466 |
Highlighted rows indicate differences between cities.
Ojai FAQ
Do I need a permit to install a home EV charger?
Yes, you need an electrical permit, but California law requires the city to expedite the review process for residential EV chargers.
Can I run a charging cable across the sidewalk?
No. Charging cables may not cross public sidewalks as they create trip hazards and ADA compliance issues.
Are there public EV chargers in Ojai?
Yes. Level 2 public chargers are available at City Hall and several commercial locations. Check apps like PlugShare for current availability.
Simi Valley FAQ
Do new homes in unincorporated Ventura County need EV charging capability?
Yes. Under CALGreen Code requirements, new single-family homes must include a Level 2 EV-capable circuit (240-volt, 40-amp minimum) in the garage or designated parking area. This is verified during the building permit process.
Can my landlord refuse to let me install an EV charger?
Under AB 2565, landlords of multi-family properties cannot unreasonably deny a tenant's written request to install EV charging equipment in their designated parking space. The tenant typically bears the installation cost.
What EV charging requirements apply to commercial buildings?
New commercial developments must designate a percentage of parking spaces as EV-capable per CALGreen Code requirements, with the number scaling based on total parking count. Contact the county building division at (805) 654-2466 for specific requirements.
Compare other topics
See how Ojai and Simi Valley compare on other ordinance categories.
Want to add a third city?
Use our full comparison tool to compare up to three cities.
Open Comparison Tool