Santa Clara has fewer restrictions than San Jose.

San Jose, CA

Santa Clara County

Some Restrictions

San Jose requires building permits for solar photovoltaic (PV) installations per SJMC Title 17 and California Solar Permitting Guidebook standards. The City has adopted AB 2188 (now Government Code §65850.5) streamlining solar permits with an expedited review process for residential rooftop systems. Residential systems up to 10 kW on single-family homes typically qualify for over-the-counter approval with a standard plan review taking 1-3 business days.

View full San Jose rules →

Santa Clara, CA

Santa Clara County

Few Restrictions

Santa Clara uses SolarAPP+ for instant residential rooftop solar permits under AB 2188, and Title 24 requires solar on new homes. Silicon Valley Power is the interconnection utility.

View full Santa Clara rules →

Key Facts Comparison

FactSan JoseSanta Clara
Code SectionSJMC Title 17; CA Gov. Code §65850.5-
Expedited Review1-3 business days for standard residential systems-
ThresholdResidential up to 10 kW qualifies for streamlined review-
Fire Setbacks3 ft ridge setback, pathway access per CFC-
NEMNet Energy Metering through PG&E-
SolarAPP+-Instant online permits for residential systems
Title 24-Solar required on new homes
Utility-Silicon Valley Power handles interconnection
Size Limit-Up to 38.4 kW DC via SolarAPP+
Contact-Building Division (408) 615-2440

Highlighted rows indicate differences between cities.

San Jose FAQ

How long does it take to get a solar permit in San Jose?

Standard residential rooftop systems typically receive permit approval within 1-3 business days through the City's expedited solar permitting process.

Does San Jose offer incentives for solar installation?

The City has reduced or waived certain permit fees for solar. Federal tax credits (ITC) and PG&E net metering are the primary financial incentives.

Santa Clara FAQ

How fast can I get a solar permit?

Typical residential systems receive same-day approval through SolarAPP+ online instant permitting.

Do new homes have to include solar?

Yes, California Title 24 requires solar PV on all new single-family and low-rise multifamily construction.

Compare other topics

See how San Jose and Santa Clara compare on other ordinance categories.

Want to add a third city?

Use our full comparison tool to compare up to three cities.

Open Comparison Tool