EV Charging: Simi Valley vs Ventura
How do ev charging rules compare between Simi Valley, CA and Ventura, CA?
Ventura has fewer restrictions than Simi Valley.
Simi Valley, CA
Ventura County
Ventura County follows California's CALGreen Code requirements for electric vehicle charging infrastructure in new construction. AB 970 and updated Title 24 standards require EV-ready parking spaces in new residential and commercial developments in unincorporated areas.
View full Simi Valley rules βVentura, CA
Ventura County
Ventura supports EV charging infrastructure under California mandates including AB 1236, which requires streamlined permitting for residential EV chargers. The City offers expedited permitting for Level 1 and Level 2 home chargers. New construction must include EV-ready parking per CALGreen code requirements.
View full Ventura rules βKey Facts Comparison
| Fact | Simi Valley | Ventura |
|---|---|---|
| Single-Family Homes | Level 2 EV circuit required (new construction) | - |
| Circuit Minimum | 240-volt, 40-amp | - |
| Tenant Rights | AB 2565 protects installation requests | - |
| Permits | Code Enforcement (805) 654-2466 | - |
| State Law | - | AB 1236 streamlined permitting |
| Home Chargers | - | Expedited permitting available |
| New Construction | - | CALGreen EV-ready parking required |
| Permit | - | Electrical permit required for installation |
Highlighted rows indicate differences between cities.
Simi Valley FAQ
Do new homes in unincorporated Ventura County need EV charging capability?
Yes. Under CALGreen Code requirements, new single-family homes must include a Level 2 EV-capable circuit (240-volt, 40-amp minimum) in the garage or designated parking area. This is verified during the building permit process.
Can my landlord refuse to let me install an EV charger?
Under AB 2565, landlords of multi-family properties cannot unreasonably deny a tenant's written request to install EV charging equipment in their designated parking space. The tenant typically bears the installation cost.
What EV charging requirements apply to commercial buildings?
New commercial developments must designate a percentage of parking spaces as EV-capable per CALGreen Code requirements, with the number scaling based on total parking count. Contact the county building division at (805) 654-2466 for specific requirements.
Ventura FAQ
Do I need a permit to install a home EV charger in Ventura?
Yes, an electrical permit is required. California AB 1236 requires the City to offer streamlined, expedited permitting for residential EV chargers. Contact Community Development at (805) 654-7869.
Can I run an EV charging cable across the sidewalk?
Running charging cables across public sidewalks or rights-of-way is generally not permitted due to tripping hazards and ADA compliance requirements.
Does new construction require EV charging in Ventura?
Yes. CALGreen building code requires new residential construction to include EV-ready parking spaces with electrical conduit and capacity for future charger installation.
Compare other topics
See how Simi Valley and Ventura compare on other ordinance categories.
Want to add a third city?
Use our full comparison tool to compare up to three cities.
Open Comparison Tool