Skip to main content
CityRuleLookup
🌍 Environmental Rules/Erosion Control

Erosion Control: Wakefield vs Waltham

How do erosion control rules compare between Wakefield, MA and Waltham, MA?

Wakefield and Waltham have similar restriction levels.

Wakefield, MA

Middlesex County

Heavy Restrictions

Erosion and sediment control is required under the Wetlands Protection Act and local bylaws. Silt fence, stabilized entrances, and inlet protection are standard.

View full Wakefield rules β†’

Waltham, MA

Middlesex County

Heavy Restrictions

Waltham requires erosion control measures on all construction sites disturbing over 1,000 square feet, with inspections by the Conservation Commission and Building Department.

View full Waltham rules β†’

Key Facts Comparison

FactWakefieldWaltham
Regs310 CMR 10.00-
StabilizationWithin 14 daysWithin 14 days
Core BMPsSilt fence, inlets-
Permit docOrder of Conditions-
EnforcementConCom and DPWDEP fines possible
Threshold-1,000 square feet disturbance
Standard BMPs-Silt fence, inlet protection
Wetlands Buffer-100 feet Con Com jurisdiction

Highlighted rows indicate differences between cities.

Wakefield FAQ

Do I need a SWPPP?

Yes for sites disturbing one acre or more under the EPA CGP.

What is a ConCom?

The local Conservation Commission, which administers the Wetlands Protection Act.

Waltham FAQ

Do I need erosion controls for a small addition in Waltham?

If you are disturbing 1,000 square feet of soil or working near wetlands, yes. Smaller projects should still prevent mud tracking onto streets.

Who inspects erosion controls in Waltham?

The Building Department during construction inspections and the Conservation Commission for wetlands-adjacent projects. Complaints can trigger additional visits.

Want to add a third city?

Use our full comparison tool to compare up to three cities.

Open Comparison Tool