Erosion Control: Wakefield vs Waltham
How do erosion control rules compare between Wakefield, MA and Waltham, MA?
Wakefield and Waltham have similar restriction levels.
Wakefield, MA
Middlesex County
Erosion and sediment control is required under the Wetlands Protection Act and local bylaws. Silt fence, stabilized entrances, and inlet protection are standard.
View full Wakefield rules βWaltham, MA
Middlesex County
Waltham requires erosion control measures on all construction sites disturbing over 1,000 square feet, with inspections by the Conservation Commission and Building Department.
View full Waltham rules βKey Facts Comparison
| Fact | Wakefield | Waltham |
|---|---|---|
| Regs | 310 CMR 10.00 | - |
| Stabilization | Within 14 days | Within 14 days |
| Core BMPs | Silt fence, inlets | - |
| Permit doc | Order of Conditions | - |
| Enforcement | ConCom and DPW | DEP fines possible |
| Threshold | - | 1,000 square feet disturbance |
| Standard BMPs | - | Silt fence, inlet protection |
| Wetlands Buffer | - | 100 feet Con Com jurisdiction |
Highlighted rows indicate differences between cities.
Wakefield FAQ
Do I need a SWPPP?
Yes for sites disturbing one acre or more under the EPA CGP.
What is a ConCom?
The local Conservation Commission, which administers the Wetlands Protection Act.
Waltham FAQ
Do I need erosion controls for a small addition in Waltham?
If you are disturbing 1,000 square feet of soil or working near wetlands, yes. Smaller projects should still prevent mud tracking onto streets.
Who inspects erosion controls in Waltham?
The Building Department during construction inspections and the Conservation Commission for wetlands-adjacent projects. Complaints can trigger additional visits.
Compare other topics
See how Wakefield and Waltham compare on other ordinance categories.
Want to add a third city?
Use our full comparison tool to compare up to three cities.
Open Comparison Tool