Erosion Control: White Plains vs Yonkers
How do erosion control rules compare between White Plains, NY and Yonkers, NY?
White Plains and Yonkers have similar restriction levels.
White Plains, NY
Westchester County
Erosion and sediment control plans required for any soil disturbance over 5,000 sq ft or within 100 ft of a watercourse, per WP stormwater chapter. Plans must follow NYS DEC Standards and Specifications for Erosion and Sediment Control (the Blue Book).
View full White Plains rules βYonkers, NY
Westchester County
Yonkers requires erosion and sediment control plans for soil disturbance of 1 acre or more under the NYS SPDES General Permit GP-0-20-001. Smaller sites follow Yonkers Code stormwater and grading provisions.
View full Yonkers rules βKey Facts Comparison
| Fact | White Plains | Yonkers |
|---|---|---|
| Threshold | 5,000 sq ft disturbance | 1 acre disturbance |
| SWPPP | Required at 1 acre (state) | - |
| Standard | NYS DEC Blue Book | - |
| Reviewer | Building Dept / DPW | - |
| Permit | - | NYS SPDES GP-0-20-001 |
| Stabilization | - | Within 14 days |
| DEC Fine | - | Up to $37,500/day |
Highlighted rows indicate differences between cities.
White Plains FAQ
Do I need erosion controls for a small home addition?
For small projects under 5,000 sq ft of disturbance, standard silt fencing along downslope edges is usually sufficient; review at building permit issuance.
When is a SWPPP required in White Plains?
A Stormwater Pollution Prevention Plan (SWPPP) is required under the NYS SPDES General Permit when soil disturbance reaches 1 acre or more.
What erosion control standards apply in White Plains?
White Plains follows the NYS DEC Standards and Specifications for Erosion and Sediment Control (the 'Blue Book'), reviewed by the Building Department and DPW Engineering.
Yonkers FAQ
Does my home addition need an erosion plan?
Only if soil disturbance is 1 acre or more. Smaller projects follow Yonkers city site plan review instead of NYS SPDES requirements.
What happens if I violate NYS erosion control rules in Yonkers?
Projects disturbing 1+ acre without an approved SWPPP under NYS SPDES GP-0-20-001 can face NYS DEC fines up to $37,500 per day.
How quickly must disturbed soil be stabilized in Yonkers?
Under NYS SPDES GP-0-20-001, disturbed soil must be stabilized within 14 days of final grading. Silt fence and stabilized construction entrances are required throughout the project.
Compare other topics
See how White Plains and Yonkers compare on other ordinance categories.
Want to add a third city?
Use our full comparison tool to compare up to three cities.
Open Comparison Tool