An accessory dwelling unit in Fort Smith requires permits from two municipal tracks: a zoning permit or special use permit through the Department of Development Services confirming the ADU is permitted in the district under the Fort Smith Unified Development Ordinance, and a building permit from the Fort Smith Building Official under the locally adopted International Residential Code for the construction itself. Arkansas has no statewide ADU preemption like California's SB 9 or Oregon's HB 2001, so timelines, fees, hearing requirements, and approval criteria are set entirely by Fort Smith pursuant to A.C.A. Β§14-56-401 et seq. and applicable local ordinances.
The two-track permitting process for a Fort Smith ADU works as follows. Zoning Track: The applicant first verifies that an ADU is permitted in the underlying district under the Fort Smith UDO. If permitted by right (a so-called "as of right" use), a zoning permit issues from Development Services upon a showing of compliance with dimensional standards. If permitted by special use permit or conditional use, the application goes to the Fort Smith Planning Commission (established under A.C.A. Β§14-56-404) which holds a public hearing with notice. If a variance is needed, the application goes to the Board of Zoning Adjustment under A.C.A. Β§14-56-416(b)(2)(C)(ii). The variance standard under Arkansas law generally requires unique physical conditions, hardship not self-created, and consistency with the spirit of the ordinance. Building Track: After zoning approval, the applicant submits construction documents to the Building Official under the locally adopted IRC. Plan review confirms structural, electrical, plumbing, mechanical, and energy provisions of the IRC for one- and two-family dwellings (or IBC for townhouses or larger configurations). Inspections occur at footing, foundation, framing, rough-in, insulation, and final stages. A Certificate of Occupancy is issued before the ADU may be occupied. Fort Smith typically requires separate utility metering or affidavits for ADUs with kitchens. Properties in the FEMA Special Flood Hazard Area along the Arkansas River face additional floodplain permit review.
Constructing an ADU without permits violates the locally adopted IRC and the Fort Smith UDO. Enforcement is through notice of violation, cease-and-desist orders, civil action in Sebastian County Circuit Court under A.C.A. Β§14-56-417, and stop-work orders from the Building Official. After-the-fact permits typically carry doubled fees and require the applicant to demonstrate code compliance through invasive inspections. Unpermitted occupancy without a Certificate of Occupancy is also a violation enforceable by Code Enforcement.
Fort Smith, AR
Swimming pools in Fort Smith must comply with the 2021 International Residential Code (Appendix G) and the Arkansas Pool Safety Act (A.C.A. 20-26-301 et seq....
Fort Smith, AR
Fort Smith's Chapter 27 UDO lists allowed residential fence materials (wood, metal tubing, wrought iron, stone, masonry, chain link, and listed vinyl/composi...
Fort Smith, AR
Fort Smith's Chapter 27 UDO does not require neighbor consent to build a fence; the owner only needs to stay on their own property and meet the city's height...
Fort Smith, AR
Fort Smith requires a building permit for any fence taller than 6 feet, issued by the Building Safety Division at 623 Garrison Avenue. Shorter fences must st...
Fort Smith, AR
Fort Smith's Unified Development Ordinance (Chapter 27, including Article 27-700 General Standards and Article 27-400 Zoning Districts) generally caps reside...
Fort Smith, AR
Fort Smith's Code of Ordinances does not impose a single fixed numerical cap on household dogs and cats, but Section 4-108 (effective July 17, 2023) requires...
See how Fort Smith's adu permits rules stack up against other locations.
Help us keep this page accurate. If you notice an error or outdated information, let us know.