An accessory dwelling unit in Reading requires permits from two municipal offices: a zoning permit from the Reading Department of Community Development (confirming the ADU is permitted in the district under the Reading Zoning Ordinance, either by right or by special exception/variance through the Reading Zoning Hearing Board) and a building permit from the Reading Building Code Official under the Pennsylvania Uniform Construction Code at 34 Pa Code Β§401.7 for the construction itself. Pennsylvania has no statewide ADU preemption like California's SB 9 or Oregon's HB 2001, so timelines, fees, and approval criteria are set by Reading and the PA UCC.
The two-track permitting process for a Reading ADU works as follows. Zoning Track: The applicant first verifies that an ADU is permitted in the underlying district under the Reading Zoning Ordinance (2014 rewrite). If permitted by right (a so-called "as of right" use), a zoning permit is issued by the Department of Community Development upon a showing of compliance with dimensional standards. If permitted by special exception or conditional use, the application goes to the Reading Zoning Hearing Board (under 53 P.S. Β§10901-10916) which holds a public hearing with notice under Β§10908 (10-day published notice, posted notice on the property). If a variance is needed, the applicant must show the five-prong hardship test from 53 P.S. Β§10910.2: unique physical conditions, no possibility of reasonable use without variance, hardship not created by appellant, no adverse effect on public health and safety, and minimum variance affording relief. Building Track: After zoning approval, the applicant submits stamped construction documents (typically by a PA-licensed architect for new dwelling units over a certain threshold) to the Reading Building Code Official under PA UCC 34 Pa Code Β§403.42a. Plan review confirms 2018 IRC compliance for one- and two-family dwellings (or IBC for townhouses or three-family-plus configurations) including structural, electrical, plumbing, mechanical, and energy provisions. Inspections occur at footing, foundation, framing, rough-in, insulation, and final stages. Certificate of Occupancy is issued under Β§110 of the IRC/IBC before the ADU may be occupied.
Constructing an ADU without permits violates 34 Pa Code Β§401.7 (building) and the Reading Zoning Ordinance (zoning). Enforcement under 53 P.S. Β§10617 (notice of violation) and Β§10617.2 (civil penalty up to $500 per day) by Reading Community Development. Stop-work orders from the Building Code Official under PA UCC Β§403.65. After-the-fact permits typically carry doubled fees and require the applicant to demonstrate code compliance through invasive inspections. Unpermitted occupancy without a Certificate of Occupancy is also a violation.
Reading, PA
Every swimming pool in Reading must be enclosed by a permanent barrier or fence at least four feet in height with no opening larger than four inches, and the...
Reading, PA
Reading Zoning Code Β§ 600-1304 bans barbed-wire fences in residential settings, electrically-charged fences (except invisible pet fences), broken glass affix...
Reading, PA
Reading's zoning code does not require neighbor consent for a boundary fence under Β§ 600-1301, but Pennsylvania's partition-fence statute (53 P.S. Β§ 46202) a...
Reading, PA
Reading Zoning Code Β§ 600-1301 requires a permit from the Zoning Administrator for any fence, wall, or similar structure greater than three feet in height. F...
Reading, PA
Reading Code Section 141-220 effectively caps a household at six dogs and/or cats combined. Owning more than six requires a permit from the Reading Animal Co...
Reading, PA
Propane (LP-gas) storage in Reading is regulated through the 2018 International Fire Code Chapter 61 (Liquefied Petroleum Gases), adopted by Reading Chapter ...
See how Reading's adu permits rules stack up against other locations.
Help us keep this page accurate. If you notice an error or outdated information, let us know.