Panel Permits: Arlington Heights vs Schaumburg
How do panel permits rules compare between Arlington Heights, IL and Schaumburg, IL?
Arlington Heights and Schaumburg have similar restriction levels.
Arlington Heights, IL
Cook County
Solar panel installations in Arlington Heights require a building permit and electrical permit. The Village follows the Illinois Solar Rights Act which protects homeowners' right to install solar energy systems. Roof-mounted systems must comply with structural and fire code requirements. Ground-mounted systems must meet setback and height restrictions.
View full Arlington Heights rules →Schaumburg, IL
Cook County
Cook County requires permits for rooftop solar panel installation on all residential rooftops. Photovoltaic panels must be roof-mounted on the principal structure. Electrical work must comply with the 2014 Cook County Electrical Code.
View full Schaumburg rules →Key Facts Comparison
| Fact | Arlington Heights | Schaumburg |
|---|---|---|
| Permits Required | Building and electrical | - |
| Solar Rights Act | Illinois protects solar access | - |
| Roof Setback | 3-foot fire access perimeter | - |
| Ground Mount Setback | 3 feet from property lines | - |
| Net Metering | Available through ComEd | - |
| Permit | - | Required for all installations |
| Location | - | Roof-mounted on principal structure |
| Electrical | - | 2014 Cook County Code |
| State Law | - | Solar access protected |
Highlighted rows indicate differences between cities.
Arlington Heights FAQ
Do I need a permit for solar panels in Arlington Heights?
Yes. Both a building permit and an electrical permit are required. The Village processes solar permits on an expedited basis consistent with state law. Submit plans showing panel layout, structural details, and electrical specifications.
Can my HOA prohibit solar panels?
The Illinois Solar Rights Act limits HOA restrictions on solar energy systems. An HOA cannot prohibit solar panels entirely but may impose reasonable aesthetic requirements that do not significantly increase cost or decrease efficiency.
Can I install ground-mounted solar panels?
Yes, in the rear yard only. Ground-mounted arrays are treated as accessory structures and must meet setback requirements of at least 3 feet from property lines and comply with height limits.
Schaumburg FAQ
Do I need a permit for solar panels in Cook County?
Yes. All residential rooftop solar installations require a building permit from Cook County Building and Zoning, plus electrical inspection compliance.
Can I install ground-mounted solar panels?
The county currently limits photovoltaic panels to roof mounting on the principal structure. Ground-mounted arrays may require additional zoning approval.
Compare other topics
See how Arlington Heights and Schaumburg compare on other ordinance categories.
Want to add a third city?
Use our full comparison tool to compare up to three cities.
Open Comparison Tool