Skip to main content
CityRuleLookup
πŸ—οΈ Accessory Structures/Shed Rules

Shed Rules: Brookline vs Holbrook

How do shed rules rules compare between Brookline, MA and Holbrook, MA?

Brookline and Holbrook have similar restriction levels.

Brookline, MA

Norfolk County

Some Restrictions

Accessory structures in Brookline must comply with dimensional requirements under the Zoning By-Law (Article V) and may require building permits. Structures in the Floodplain Overlay District require a Floodplain Development Permit.

View full Brookline rules β†’

Holbrook, MA

Norfolk County

Some Restrictions

Holbrook applies the Massachusetts State Building Code (780 CMR, 10th edition) and the Holbrook Zoning Bylaw. Under 780 CMR, sheds up to 200 square feet typically do not require a state building permit, but zoning setbacks still apply. The Holbrook Building Department issues permits for larger structures and confirms setback compliance.

View full Holbrook rules β†’

Key Facts Comparison

FactBrooklineHolbrook
CodeBrookline ZO Art. V (Dimensional Requirements)-
Permit Generally RequiredYes β€” confirm small shed threshold with Building Dept.-
FloodplainAdditional Floodplain Development Permit required-
ContactBuilding Dept.: (617) 730-2090-
State Permit Trigger-Over 200 sq ft (780 CMR R105.2)
Typical Side/Rear Setback-10 ft (verify zone)
Authority-Holbrook Building Department
ADU Law-MA statewide ADU law (2025)

Highlighted rows indicate differences between cities.

Brookline FAQ

Do I need a permit for a shed in Brookline?

Accessory structures in Brookline must comply with dimensional requirements under the Zoning By-Law (Article V) and may require building permits. Structures in the Floodplain Overlay District require a Floodplain Development Permit.

How big can a shed be without a permit in Brookline?

Code: Brookline ZO Art. V (Dimensional Requirements). Permit Generally Required: Yes β€” confirm small shed threshold with Building Dept.. Floodplain: Additional Floodplain Development Permit required. Contact: Building Dept.: (617) 730-2090.

Holbrook FAQ

Do I need a permit for a shed in Holbrook, MA?

Not under the state building code if the shed is 200 sq ft or less and one story. You still must comply with Holbrook's zoning setbacks (typically 10 ft from side and rear lot lines) and the local zoning bylaw.

How big can my shed be without a permit in Holbrook?

Up to 200 square feet, one story, under Massachusetts State Building Code section R105.2. Anything larger needs a building permit from the Holbrook Building Department.

Compare other topics

See how Brookline and Holbrook compare on other ordinance categories.

Want to add a third city?

Use our full comparison tool to compare up to three cities.

Open Comparison Tool