Skip to main content
CityRuleLookup
🌍 Environmental Rules/Erosion Control

Erosion Control: Clovis vs Reedley

How do erosion control rules compare between Clovis, CA and Reedley, CA?

Clovis and Reedley have similar restriction levels.

Clovis, CA

Fresno County

Some Restrictions

Grading/construction sites require erosion and sediment controls per Clovis Municipal Code Title 9 and the city's SWPPP requirements. BMPs required year-round, with enhanced controls during the wet season (Oct 1–Apr 30).

View full Clovis rules β†’

Reedley, CA

Fresno County

Some Restrictions

Reedley requires erosion and sediment control measures for all construction and grading activities in compliance with the 2022 California Building Code grading provisions adopted under RMC Title 9 and stormwater quality regulations under Title 12. All projects requiring a grading permit must submit an erosion and sediment control plan demonstrating how soil disturbance will be managed during and after construction to prevent sediment from leaving the site. Projects disturbing one acre or more require a Stormwater Pollution Prevention Plan under the state Construction General Permit. The San Joaquin Valley climate, with its dry summers and concentrated winter rainfall between October and April, creates particular erosion risks when seasonal rains hit exposed construction soils. Enhanced erosion controls including stockpile covering, slope stabilization, and accelerated grading schedules are required during the wet season to protect water quality in the Kings River watershed.

View full Reedley rules β†’

Key Facts Comparison

FactClovisReedley
State PermitCGP if 1+ acre disturbed-
SWPPPRequired for 1+ acre-
Wet SeasonOct 1 – Apr 30October through April
BMPsYear-round-
EnforcementPublic Works-
Erosion Plan Required-With all grading permits
SWPPP Trigger-1+ acre disturbance
State Fines-Up to $10,000/day
Building Division-(559) 637-4200

Highlighted rows indicate differences between cities.

Clovis FAQ

Do I need erosion controls for a small residential project?

Yes. Even sub-acre grading must use BMPs like silt fences and stabilized construction entrances. The SWPPP requirement only kicks in at 1 acre of disturbance.

When does Clovis require a SWPPP for construction?

When site disturbance reaches 1 acre or more, triggering coverage under the State Construction General Permit and a Notice of Intent filing with the State Water Board.

When is wet-season erosion control required in Clovis?

October 1 through April 30. During this window, Clovis Public Works requires enhanced BMPs (covers, fiber rolls, inlet protection) on active construction sites.

Reedley FAQ

When do I need an erosion control plan in Reedley?

All projects requiring a grading permit must include an erosion and sediment control plan with specific BMPs for each construction phase. Projects disturbing one acre or more also need a full SWPPP prepared by a Qualified SWPPP Developer under the state Construction General Permit.

What erosion control measures are typically required?

Common measures include silt fences, fiber rolls (straw wattles), gravel bag barriers, stabilized construction entrances, dust control watering, slope stabilization with erosion blankets, and stockpile covering. Enhanced controls are required during the October-April wet season.

What happens if sediment leaves my construction site?

Sediment discharge into streets or storm drains can result in city stop-work orders and code enforcement citations. The Central Valley Regional Water Quality Control Board may also pursue enforcement with administrative civil liability of up to $10,000 per day of violation.

Want to add a third city?

Use our full comparison tool to compare up to three cities.

Open Comparison Tool