Clovis, CA Environmental Rules: Erosion Control (2026)
Key Facts
- Governing section
- Clovis Municipal Code § 9.110.040(A)(4), (A)(8), (B)
- Plan preparer
- Registered civil engineer
- Approving official
- City Engineer
- Reference standard
- CBC Appendix Chapter 70
- Security
- Bond required before grading on unrecorded parcels
Summary
Clovis Municipal Code Section 9.110.040 requires every subdivision grading plan to use best-available management practices to hold down erosion, sedimentation, and dust, and to be designed with erosion and sediment control measures built in. Final maps are conditioned on compliance with the erosion-control provisions of Appendix Chapter 70 of the California Building Code.
4. Grading practices. All grading within the City shall employ the best available management practices, as determined by the City Engineer, to minimize erosion, sedimentation, airborne dust, and unnecessary grading. Each building site on sloping parcels shall be individually prepared... 8. Compliance with California Building Code required. Every map approved in compliance with the provisions of this chapter shall be conditioned on compliance with the requirements for grading and erosion control, including the prevention of sedimentation or damages to off-site property, in compliance with Appendix Chapter 70 of the California Building Code, as adopted and amended from time to time by the City... B. Erosion and sediment control. A proposed subdivision shall be designed so that all grading incorporates appropriate erosion and sediment control measures.
Full Breakdown
040 sets the grading standards a subdivider must meet before the City issues a building permit for a new subdivision in Clovis. Subsection A requires a grading plan prepared and signed by a registered civil engineer, submitted to and approved by the City Engineer, showing natural and finished grades, pad and floor elevations, drainage swale directions, retaining wall heights, and existing topography and drainage outside the project boundary. 3 bars inter-parcel 'cross drainage,' requiring each parcel to drain to a public street or an approved drainage facility rather than across a neighboring lot.
4, Grading practices, requires all grading citywide to employ the best available management practices, as determined by the City Engineer, specifically to minimize erosion, sedimentation, airborne dust, and unnecessary grading, with each building site on a sloping parcel individually prepared. 6 lets the City require a bond before grading begins on a site not yet recorded, to cover landscaping and erosion control if the subdivider abandons the project mid-grade. 8 conditions every approved subdivision map on compliance with the grading and erosion-control requirements, including prevention of sedimentation or damage to off-site property, found in Appendix Chapter 70 of the California Building Code. 070 must recommend corrective action and special erosion-control precautions.
Violations & Fines
A subdivision map or grading plan that does not incorporate the required erosion and sediment control measures, or that fails to follow Appendix Chapter 70 of the California Building Code, is not entitled to final map approval; the City Engineer can withhold grading approval, and if a subdivider abandons a site after grading without completing erosion control, the City can draw on the Section A.6 bond to install the required landscaping and erosion measures itself.
Frequently Asked Questions
Does a Clovis subdivision need erosion control during grading?
Who approves a subdivision grading plan in Clovis?
What happens if a developer abandons a Clovis subdivision after grading starts?
Sources & Official References
Other rules in Clovis
California rules heatmap·Compare Clovis to another location·View the California environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Erosion Control in Nearby Cities
How other cities in Fresno County handle erosion control.