Clovis, CA Parking Rules: EV Charging (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Governing chapter
Clovis Municipal Code Chapter 8.18
Adopted
Ordinance 17-16, effective October 5, 2017
State authority
Govt. Code § 65850.7 (AB 1236)
Review type
Nondiscretionary; no public hearing
Submittal
Email, web portal, or fax accepted
HOA approval
Cannot be required (Civ. Code § 4080)

Summary

Clovis implements California's mandatory EV-charger permitting law through Municipal Code Chapter 8.18, requiring the Building Official to run an expedited, nondiscretionary review track for electric vehicle charging stations. Consistent with Government Code Section 65850.7, applications meeting the City's published checklist must be approved and all necessary permits issued without a discretionary hearing.

Consistent with Government Code Section 65850.7, the Building Official shall implement an expedited, streamlined permitting process for electric vehicle charging stations, and adopt a checklist of all requirements with which electric vehicle charging stations shall comply with in order to be eligible for expedited review. The expedited, stream-lined permitting process and checklist may refer to the recommendations contained in the most current version of the "Plug-In Electric Vehicle Infrastructure Permitting Checklist" of the "Zero-Emission Vehicles in California: Community Readiness Guidebook" as published by the Governor's Office of Planning and Research. The City's checklist shall be published on the City's website.

Source: California Gov Code 65850.7 - EV ChargingView official code

Full Breakdown

7. 02 defines a covered "electric vehicle charging station" as supply equipment built to Article 625 of the California Electrical Code that "delivers electricity from a source outside an electric vehicle into a plug-in electric vehicle," and allows "electronic submittal" of applications by email, internet portal, or facsimile. 03, the Building Official must adopt a compliance checklist modeled on the Governor's Office of Planning and Research "Plug-In Electric Vehicle Infrastructure Permitting Checklist" and publish it on the City's website. 04(a) requires the applicant to verify the installation will not have a "specific, adverse impact" on electrical system capacity and loads, wiring, bonding, and overcurrent protection, or affected building infrastructure.

04(b) directs the Building Official to "approve the application and issue all necessary permits" without a discretionary hearing, though approval does not authorize energizing the station until a final inspection is approved; an incomplete application instead draws a written correction notice detailing every deficiency. 04(c) requires the City to accept electronic applications and electronic signatures in place of a wet signature. 05(b) bars the City from conditioning any charging-station permit on approval by a homeowners' association under Civil Code Section 4080. 06, and the added charging load must be folded into the building's electrical load calculations as a continuous load.

Violations & Fines

Clovis carries no stand-alone penalty clause in Chapter 8.18; an unpermitted or improperly energized charging station is enforced the same as any other unpermitted Title 8 building improvement. Installing or energizing a station before the Building Official signs off on final inspection triggers the Section 8.1.01.1(e) investigation fee: an amount equal to the permit fee for a first unpermitted-work violation, rising to three times the permit fee on a second violation by the same permittee, four times on a third, five times on a fourth, and so on to a ten-times cap, on top of the Section 8.1.02.1 misdemeanor exposure that applies Code-wide.

Frequently Asked Questions

Does Clovis require a public hearing to install a home EV charger?
No. Section 8.18.04(b) requires the Building Official to approve a complete application against the City's published checklist and "issue all necessary permits" through the standard nondiscretionary process, consistent with Government Code Section 65850.7. Approval does not let you energize the equipment, though: the station still needs a final inspection sign-off first.
Can my HOA block an EV charging station Clovis has permitted?
No. Section 8.18.05(b) bars the Building Official from "conditioning the approval for any electric vehicle charging station permit on the approval of such a system by an association, as that term is defined by Civil Code Section 4080." The City still requires the equipment to meet Article 625 of the California Electrical Code and pass a final inspection.
What has to be verified before applying for an EV charger permit in Clovis?
Section 8.18.04(a) requires the applicant to confirm in advance that the installation will not create a "specific, adverse impact" on the building's electrical capacity and loads, wiring, bonding, and overcurrent protection, or on building infrastructure and parking areas affected by the equipment and its conduits, before submitting the application.

Sources & Official References

Other rules in Clovis

All Clovis rules

California rules heatmap·Compare Clovis to another location·View the California parking rules overview

Get notified when EV Charging in Clovis, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

EV Charging in Nearby Cities

How other cities in Fresno County handle ev charging.

Fresno, CA
Some Restrictions