Skip to main content
CityRuleLookup
☀️ Solar Energy/Panel Permits

Panel Permits: Clovis vs Reedley

How do panel permits rules compare between Clovis, CA and Reedley, CA?

Clovis has fewer restrictions than Reedley.

Clovis, CA

Fresno County

Few Restrictions

Solar permits in Clovis use AB 2188 expedited online process — same-day or 1-3 business day approval for residential systems ≤38.4 kW. CA Title 24 Part 6 requires solar on new single-family homes (2020 Energy Code).

View full Clovis rules →

Reedley, CA

Fresno County

Some Restrictions

Solar panel installations in Reedley require a building permit from the Building Division, which reviews plans for compliance with the 2022 California Building Code and local zoning regulations. The city uses an online citizen portal at reedley.portal.iworq.net for permit submissions. Under California Assembly Bill 1414 and Government Code Section 65850.5, Reedley must provide a streamlined, nondiscretionary permitting process for small residential rooftop solar energy systems up to 10 kilowatts, meaning these applications must be approved administratively without discretionary design review. Required submittals typically include equipment specification sheets for UL-listed panels and inverters, structural attachment details showing how the racking system connects to the roof, and an electrical single-line diagram. Fire code setbacks from roof edges and ridges must be maintained for firefighter access. California Title 24 energy standards require solar panels on most new single-family residential construction since 2020.

View full Reedley rules →

Key Facts Comparison

FactClovisReedley
ExpeditedAB 2188 / SolarAPP+-
System Limit38.4 kW DC-
New HomesRequired (T24)-
Turnaround1-3 business days-
Permit Required-Yes, building permit
Online Portal-reedley.portal.iworq.net
Streamlined Review-Systems up to 10 kW
Fire Setback (Ridge)-3 feet typical
Building Division-(559) 637-4200

Highlighted rows indicate differences between cities.

Clovis FAQ

How long does a Clovis solar permit take?

1-3 business days for residential systems using Clovis's AB 2188 expedited online process.

Is solar required on new Clovis homes?

Yes. CA Title 24 Part 6 (effective 2020) requires solar PV on all new single-family homes, sized to offset the home's electrical TDV.

Reedley FAQ

Do I need a permit for solar panels in Reedley?

Yes. A building permit is required for all solar panel installations. Applications can be submitted through the city's online citizen portal at reedley.portal.iworq.net, or you can contact the Building Division at (559) 637-4200 for assistance.

How long does the solar permit process take in Reedley?

California law requires streamlined, nondiscretionary review for small residential rooftop systems up to 10 kW. These should be processed within a few business days through a checklist-based review. Larger or more complex systems may require additional plan review time.

Are solar panels required on new homes in Reedley?

Yes. Since January 1, 2020, California Title 24 energy standards require solar photovoltaic systems on most new single-family residential construction. The solar requirement is reviewed as part of the building permit for new homes.

Compare other topics

See how Clovis and Reedley compare on other ordinance categories.

Want to add a third city?

Use our full comparison tool to compare up to three cities.

Open Comparison Tool