Panel Permits: Clovis vs Selma
How do panel permits rules compare between Clovis, CA and Selma, CA?
Clovis and Selma have similar restriction levels.
Clovis, CA
Fresno County
Solar permits in Clovis use AB 2188 expedited online process — same-day or 1-3 business day approval for residential systems ≤38.4 kW. CA Title 24 Part 6 requires solar on new single-family homes (2020 Energy Code).
View full Clovis rules →Selma, CA
Fresno County
Selma uses SolarAPP+ for instant residential solar permits. Standard permits require site plan, building plans, and Title 24 docs. AB 2188 streamlined process applies.
View full Selma rules →Key Facts Comparison
| Fact | Clovis | Selma |
|---|---|---|
| Expedited | AB 2188 / SolarAPP+ | - |
| System Limit | 38.4 kW DC | - |
| New Homes | Required (T24) | - |
| Turnaround | 1-3 business days | - |
| Permit System | - | SolarAPP+ (instant issuance) |
| Plan Revisions | - | 3 free revisions |
| Building Code | - | 2022 California Building Code |
| Contact | - | (559) 891-2208 |
Highlighted rows indicate differences between cities.
Clovis FAQ
How long does a Clovis solar permit take?
1-3 business days for residential systems using Clovis's AB 2188 expedited online process.
Is solar required on new Clovis homes?
Yes. CA Title 24 Part 6 (effective 2020) requires solar PV on all new single-family homes, sized to offset the home's electrical TDV.
Selma FAQ
How do I get a solar panel permit in Selma?
For qualifying residential systems, register at solarapp.nrel.gov, submit your application through SolarAPP+, then upload the approved documents to the Selma Permit Center. Once fees are paid, the permit is issued instantly. Projects not eligible for SolarAPP+ go through the standard plan check process.
How long does it take to get a solar permit in Selma?
Through SolarAPP+, qualifying residential solar permits are issued instantly once the application is completed and fees are paid. Standard solar permits go through the regular plan check process, which may take several business days.
Do I need an inspection after installing solar panels in Selma?
Yes. The Selma Building Department must conduct an inspection to verify structural attachment, electrical connections, and code compliance before the system can be connected to the utility grid.
Compare other topics
See how Clovis and Selma compare on other ordinance categories.
Want to add a third city?
Use our full comparison tool to compare up to three cities.
Open Comparison Tool