Skip to main content
CityRuleLookup
☀️ Solar Energy/Panel Permits

Costa Mesa vs Huntington Beach

How do panel permits rules compare between Costa Mesa, CA and Huntington Beach, CA?

Costa Mesa and Huntington Beach have similar restriction levels.

Costa Mesa, CA

Orange County

Few Restrictions

Costa Mesa offers an expedited, streamlined permitting process for small residential solar energy systems complying with AB 2188 and the California Solar Rights Act. Systems up to 10 kW AC on single-family or duplex dwellings qualify for simplified plan check through the city's online TESSA portal.

View full Costa Mesa rules →

Huntington Beach, CA

Orange County

Few Restrictions

Huntington Beach has adopted an expedited permitting process for small residential rooftop solar under HBMC. The Building Official implements a nondiscretionary administrative review using standard plans and checklists to minimize costs and processing time.

View full Huntington Beach rules →

Key Facts Comparison

FactCosta MesaHuntington Beach
Permit PortalTESSA online system-
Small SystemUp to 10 kW AC or 30 kW thermal-
Eligible DwellingsSingle-family or duplex-
Processing Time7-21 days typical-
Building Safety(714) 754-5245-
Permit Process-Expedited, nondiscretionary
Review Type-Standard plans + checklist
Permits Required-Building + electrical
Processing-Streamlined per state law
Code Section-HBMC — Rooftop Solar Systems

Highlighted rows indicate differences between cities.

Costa Mesa FAQ

How do I apply for a solar panel permit in Costa Mesa?

Submit your application through the city's online TESSA portal. Small residential systems (up to 10 kW AC) on single-family or duplex homes qualify for expedited processing under AB 2188. The process typically takes 7 to 21 days for standard installations.

Do I need a permit for solar panels in Costa Mesa?

Yes, a building permit is required for all solar panel installations in Costa Mesa. However, the city offers a streamlined process for small residential systems that complies with AB 2188, making the permitting process faster and simpler.

Does the coastal zone affect solar permits in Costa Mesa?

Yes. Properties within the California Coastal Zone may require a Coastal Development Permit from the California Coastal Commission in addition to the city building permit, which can extend timelines to 3 to 6 months.

Huntington Beach FAQ

How do I get a solar permit in Huntington Beach?

Apply through the Permit Center. The city uses an expedited checklist-based review for small residential systems. Both building and electrical permits are needed.

How long does a solar permit take?

The city processes solar permits through an expedited nondiscretionary review per state law, designed to minimize processing time.

Compare other topics

See how Costa Mesa and Huntington Beach compare on other ordinance categories.

Want to add a third city?

Use our full comparison tool to compare up to three cities.

Open Comparison Tool