Skip to main content
CityRuleLookup
🌍 Environmental Rules/Erosion Control

Erosion Control: Des Plaines vs Orland Park

How do erosion control rules compare between Des Plaines, IL and Orland Park, IL?

Des Plaines and Orland Park have similar restriction levels.

Des Plaines, IL

Cook County

Some Restrictions

Construction sites in Des Plaines disturbing 1/2 acre or more must implement erosion and sediment control measures under the MWRD Watershed Management Ordinance. Sites disturbing 1 acre or more must obtain Illinois EPA NPDES coverage under General Permit ILR10 with a Stormwater Pollution Prevention Plan.

View full Des Plaines rules β†’

Orland Park, IL

Cook County

Some Restrictions

Erosion and sediment control in Orland Park follows the Cook County Watershed Management Ordinance and Illinois EPA NPDES Construction Stormwater General Permit. Sites disturbing 0.5 acres or more require erosion control measures including silt fence, inlet protection, and stabilized construction entrances. Smaller sites must still prevent sediment from leaving the property.

View full Orland Park rules β†’

Key Facts Comparison

FactDes PlainesOrland Park
BMP Threshold1/2 acre-
NPDES Threshold1 acre1 acre disturbance
PermitIL EPA ILR10-
SWPPPRequired >1 acre-
TrackoutMust be cleaned-
WMO Threshold-0.5 acre disturbance
Standard Controls-Silt fence, inlet protection
Track-Out-Must clean Village streets
Stabilization-Required on disturbed soil

Highlighted rows indicate differences between cities.

Des Plaines FAQ

Do I need erosion control for a home addition?

Smaller projects below 1/2 acre disturbance still must manage soil and prevent sediment from leaving the site. Larger projects must implement formal erosion control plans approved by City Engineering.

When do I need an Illinois EPA permit?

Construction projects disturbing 1 acre or more of land must obtain NPDES coverage under General Permit ILR10 and prepare a Stormwater Pollution Prevention Plan.

What about sediment tracked onto the street?

Trackout from construction sites onto public streets is prohibited and must be cleaned promptly. Stabilized construction entrances are required to minimize trackout.

Orland Park FAQ

What erosion controls do I need on my construction site?

Sites disturbing 0.5 acres or more need a Soil Erosion and Sediment Control Plan with silt fence, inlet protection, and stabilized construction entrance. Sites disturbing 1 acre or more also need NPDES coverage.

What about a small home addition?

Small sites must still prevent sediment from leaving the property and clean any mud tracked onto Village streets. Building permit conditions typically address these requirements.

Who do I report a muddy construction site to?

Contact Orland Park Public Works at (708) 403-6350 or Code Enforcement at (708) 403-6150. Track-out onto Village streets is a frequent complaint trigger.

Want to add a third city?

Use our full comparison tool to compare up to three cities.

Open Comparison Tool