Doral has fewer restrictions than Miami.

Doral, FL

Miami-Dade County

Some Restrictions

Doral requires erosion and sediment controls on all construction sites to prevent sediment discharge into the stormwater system. Projects disturbing one or more acres must implement a Stormwater Pollution Prevention Plan (SWPPP) with specific BMPs. Silt fences, inlet protection, and stabilization measures must be maintained throughout construction.

View full Doral rules β†’

Miami, FL

Miami-Dade County

Heavy Restrictions

Miami requires erosion and sediment control measures on all construction sites under the city code and FDEP NPDES Construction General Permit requirements. BMPs must be installed before land-disturbing activities begin given Miami's proximity to Biscayne Bay and coastal waterways.

View full Miami rules β†’

Key Facts Comparison

FactDoralMiami
SWPPP RequiredYes, for 1+ acre disturbance-
Silt FenceRequired along all disturbed perimeters-
Inlet ProtectionRequired within 50 ft of drains-
Inspection FrequencyEvery 7 days and after 0.5-inch rain-
Soil StabilizationWithin 14 days if undisturbed-
State Permit-FDEP NPDES Construction General Permit for 1+ acre
Stabilization-7 days on inactive areas
Waterfront Sites-Turbidity barriers required
Dewatering-Separate permit required
Penalty-Up to $500/day plus state/federal penalties

Highlighted rows indicate differences between cities.

Doral FAQ

What erosion controls are required on Doral construction sites?

All construction sites must install silt fences, inlet protection for nearby storm drains, stabilized construction entrances, and temporary stabilization of exposed soils. Projects over one acre also need NPDES permit coverage with a SWPPP.

How often must erosion controls be inspected in Doral?

Erosion control BMPs must be inspected at least every 7 calendar days and after any rainfall event of 0.5 inches or more. Inspection records must be maintained on-site as part of the SWPPP.

Can I discharge dewatering water to the storm drain in Doral?

No. Dewatering discharges require separate permits and turbid water must be treated before discharge to prevent sediment from entering the stormwater system and downstream canals.

Miami FAQ

What erosion controls are needed for waterfront construction?

Waterfront construction near Biscayne Bay requires turbidity barriers in addition to standard BMPs like silt fences and inlet protection due to the sensitivity of the marine environment.

When must erosion controls be installed?

Erosion and sediment controls must be installed before any land-disturbing activity begins and maintained throughout construction until permanent stabilization.