Skip to main content
CityRuleLookup
🌍 Environmental Rules/Stormwater Management

Stormwater Management: Doral vs Miami

How do stormwater management rules compare between Doral, FL and Miami, FL?

Doral and Miami have similar restriction levels.

Doral, FL

Miami-Dade County

Heavy Restrictions

Doral enforces comprehensive stormwater management regulations requiring new development and redevelopment to retain stormwater on-site consistent with South Florida Water Management District (SFWMD) standards. Projects disturbing one or more acres must obtain NPDES stormwater permits. The city operates under an MS4 permit requiring pollution prevention controls on all construction and post-construction activities.

View full Doral rules β†’

Miami, FL

Miami-Dade County

Heavy Restrictions

Miami enforces comprehensive stormwater management under Chapter 17 of the City Code (Stormwater Utility) and Miami-Dade County Environmental Resource standards. The city operates a Municipal Separate Storm Sewer System (MS4) under an NPDES permit issued by the Florida DEP.

View full Miami rules β†’

Key Facts Comparison

FactDoralMiami
Retention StandardFirst inch of rainfall on-siteFirst inch of rainfall on-site
NPDES Trigger1+ acre of land disturbance-
SWPPP RequiredYes, for 1+ acre projects-
Facility MaintenanceOwner/HOA responsible, annual certification-
Permit AuthoritySFWMD ERP and FDEP NPDES-
Governing Code-City Code Chapter 17 (Stormwater Utility)
Fee Basis-Impervious surface area
Regional Permit-SFWMD Environmental Resource Permit
Penalty-Up to $500/day per violation

Highlighted rows indicate differences between cities.

Doral FAQ

When do I need a stormwater permit in Doral?

Projects disturbing one or more acres require an NPDES Construction General Permit from FDEP with a SWPPP. All new development requires stormwater management plans as part of site plan review through Growth Management at (305) 593-6630.

What stormwater retention is required for new development in Doral?

New development must retain or detain the first inch of rainfall on-site and ensure post-development discharge does not exceed pre-development rates, consistent with SFWMD Environmental Resource Permit standards.

Who maintains stormwater facilities in Doral developments?

Property owners or HOAs are responsible for maintaining stormwater facilities within their developments, with annual inspection and maintenance certification required. The city's Public Works Department maintains the municipal drainage system.

Miami FAQ

Does Miami charge a stormwater fee?

Yes. Miami charges a stormwater utility fee based on the impervious surface area on a property. Reducing impervious coverage through approved green infrastructure may lower the fee.

What stormwater retention is required?

New development must retain the first inch of rainfall on-site. The city's high water table and low elevation require specialized solutions such as exfiltration trenches.

Want to add a third city?

Use our full comparison tool to compare up to three cities.

Open Comparison Tool