Dunedin vs Pinellas Park
How do panel permits rules compare between Dunedin, FL and Pinellas Park, FL?
Dunedin and Pinellas Park have similar restriction levels.
Dunedin, FL
Pinellas County
Dunedin requires building and electrical permits for solar PV installations and offers a $0.25 per watt rebate up to $2,500 for residents and businesses. Applications are processed via the Dunedin CSS online portal.
View full Dunedin rules →Pinellas Park, FL
Pinellas County
Rooftop and ground-mount solar PV systems in Pinellas Park require a building and electrical permit through the Building Development Division. Most residential applications are reviewed within about ten business days.
View full Pinellas Park rules →Key Facts Comparison
| Fact | Dunedin | Pinellas Park |
|---|---|---|
| Permits required | Building plus electrical | - |
| Rebate rate | $0.25 per watt | - |
| Rebate cap | $2,500 maximum | - |
| Processing time | 2 to 4 weeks | - |
| Portal | Dunedin CSS online | - |
| Permit required | - | Yes |
| Issued by | - | Building Development |
| Typical review | - | About 10 business days |
| Code basis | - | Florida Building Code |
| Penalty | - | Double fees and stop work |
Highlighted rows indicate differences between cities.
Dunedin FAQ
Do I need a permit to install solar panels in Dunedin?
Yes. Both building and electrical permits are required for any rooftop or ground-mount PV system. Apply through the Dunedin CSS portal and expect 2 to 4 weeks for review and inspections.
How does the Dunedin solar rebate work?
The city pays $0.25 per installed watt up to $2,500 for residents and businesses. Apply after final inspection through Sustainable Development. Rebate funds are limited and awarded first-come.
Pinellas Park FAQ
How long does a Pinellas Park solar permit take?
Most complete residential solar PV applications are reviewed and a permit issued within about ten business days. Applications with missing structural calcs, single-line diagrams, or utility documents take longer.
Can I install panels myself as the homeowner?
Florida allows owner-builder permits for an owner-occupied home, but the Building Development Division still requires complete plans, inspections, and licensed electrical work. Most homeowners hire a Florida-licensed solar contractor instead.
Compare other topics
See how Dunedin and Pinellas Park compare on other ordinance categories.
Want to add a third city?
Use our full comparison tool to compare up to three cities.
Open Comparison Tool