🌍 Environmental Rules/Erosion Control

Fontana vs Victorville

How do erosion control rules compare between Fontana, CA and Victorville, CA?

Fontana and Victorville have similar restriction levels.

Fontana, CA

San Bernardino County

Heavy Restrictions

Fontana requires erosion and sediment-control BMPs on graded sites. The California Construction General Permit and FMC grading code require silt fences and stabilized entrances during the Oct-Apr wet season.

View full Fontana rules →

Victorville, CA

San Bernardino County

Heavy Restrictions

Victorville requires erosion control plans for grading over 50 cubic yards or slopes. MDAQMD Rule 403 mandates dust suppression. Desert flash floods make sediment control critical.

View full Victorville rules →

Key Facts Comparison

FactFontanaVictorville
State PermitConstruction General Permit-
Trigger1+ acre disturbed-
Wet SeasonOct 1-Apr 30-
Grading Trigger50+ cubic yards-
Daily FineUp to $500+ city-
Grading threshold-50 cubic yards or 3:1 slopes
Plan required-Erosion control plan with permit
Dust rule-MDAQMD Rule 403
BMPs-Silt fence, wattles, stabilization
Fines-Up to $10,000/day

Highlighted rows indicate differences between cities.

Fontana FAQ

Do I need erosion control for a small Fontana backyard project?

Small residential projects under 50 cubic yards typically do not need a grading permit, but you must still prevent sediment from entering the storm drain.

When is the rainy-season BMP period in Fontana?

October 1 through April 30. Active construction sites must have rain-ready BMPs deployed throughout this period.

Victorville FAQ

Do I need a plan for a small backyard project?

Under 50 cubic yards typically is exempt from grading permit, but MDAQMD dust rules still apply.

What counts as dust control?

Water application, gravel surfacing, polymer stabilizers, or vegetative cover on disturbed soil.

Want to add a third city?

Use our full comparison tool to compare up to three cities.

Open Comparison Tool